{"title":"预测误差对价格敏感型客户日前调度的影响","authors":"G. Carpinelli, F. Mottola, P. De Falco","doi":"10.1109/EFEA.2018.8617102","DOIUrl":null,"url":null,"abstract":"Scheduling the distributed energy resources in day-ahead scenarios requires the use of accurate forecasts of loads, generation, and energy prices. Forecasting errors may significantly influence the quality of the scheduling, resulting in overestimations or underestimations of the power required from the grid by a price-responsive customer. In this paper we provide an insight on the assessment of the impact of forecasting errors in a case study regarding an industrial customer who disposes of a photovoltaic system and of an electrical energy storage system. The day-ahead scheduling procedure, developed in previous works, is applied using forecasts obtained through random forests and through a benchmark model; the obtained results are compared with the ideal scenario, using the actual realizations of the unknown variables, in order to assess the responsiveness of the scheduling procedure to forecasting errors.","PeriodicalId":447143,"journal":{"name":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Impact of Forecasting Errors on Day-Ahead Scheduling of Price-Responsive Customers\",\"authors\":\"G. Carpinelli, F. Mottola, P. De Falco\",\"doi\":\"10.1109/EFEA.2018.8617102\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling the distributed energy resources in day-ahead scenarios requires the use of accurate forecasts of loads, generation, and energy prices. Forecasting errors may significantly influence the quality of the scheduling, resulting in overestimations or underestimations of the power required from the grid by a price-responsive customer. In this paper we provide an insight on the assessment of the impact of forecasting errors in a case study regarding an industrial customer who disposes of a photovoltaic system and of an electrical energy storage system. The day-ahead scheduling procedure, developed in previous works, is applied using forecasts obtained through random forests and through a benchmark model; the obtained results are compared with the ideal scenario, using the actual realizations of the unknown variables, in order to assess the responsiveness of the scheduling procedure to forecasting errors.\",\"PeriodicalId\":447143,\"journal\":{\"name\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EFEA.2018.8617102\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 5th International Symposium on Environment-Friendly Energies and Applications (EFEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EFEA.2018.8617102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Impact of Forecasting Errors on Day-Ahead Scheduling of Price-Responsive Customers
Scheduling the distributed energy resources in day-ahead scenarios requires the use of accurate forecasts of loads, generation, and energy prices. Forecasting errors may significantly influence the quality of the scheduling, resulting in overestimations or underestimations of the power required from the grid by a price-responsive customer. In this paper we provide an insight on the assessment of the impact of forecasting errors in a case study regarding an industrial customer who disposes of a photovoltaic system and of an electrical energy storage system. The day-ahead scheduling procedure, developed in previous works, is applied using forecasts obtained through random forests and through a benchmark model; the obtained results are compared with the ideal scenario, using the actual realizations of the unknown variables, in order to assess the responsiveness of the scheduling procedure to forecasting errors.