{"title":"氢燃料电池动力系统降低了电力成本","authors":"M. Romeri","doi":"10.2139/ssrn.2006758","DOIUrl":null,"url":null,"abstract":"Investment costs are probably the most important element in any investment decision. They vary greatly from technology to technology, from time to time and from country to country. Overnight cost is a common unit of measure of power investments. Overnight cost is the cost of a construction project if no interest was incurred during construction, as if the project was completed “overnight.” The unit of measure typically used for Overnight cost is USD/kW.","PeriodicalId":313084,"journal":{"name":"EnergyRN eJournal","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-02-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Hydrogen Fuel Cell Powertrain Levelized Cost of Electricity\",\"authors\":\"M. Romeri\",\"doi\":\"10.2139/ssrn.2006758\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Investment costs are probably the most important element in any investment decision. They vary greatly from technology to technology, from time to time and from country to country. Overnight cost is a common unit of measure of power investments. Overnight cost is the cost of a construction project if no interest was incurred during construction, as if the project was completed “overnight.” The unit of measure typically used for Overnight cost is USD/kW.\",\"PeriodicalId\":313084,\"journal\":{\"name\":\"EnergyRN eJournal\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-02-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EnergyRN eJournal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2006758\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EnergyRN eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2006758","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Hydrogen Fuel Cell Powertrain Levelized Cost of Electricity
Investment costs are probably the most important element in any investment decision. They vary greatly from technology to technology, from time to time and from country to country. Overnight cost is a common unit of measure of power investments. Overnight cost is the cost of a construction project if no interest was incurred during construction, as if the project was completed “overnight.” The unit of measure typically used for Overnight cost is USD/kW.