在35天的周转期内成功执行更换4个15千伏开关柜和7个中压电机控制中心的项目-一个案例研究

Jacqueline Morris, Ken Long, S. Kelley, D. Cochran
{"title":"在35天的周转期内成功执行更换4个15千伏开关柜和7个中压电机控制中心的项目-一个案例研究","authors":"Jacqueline Morris, Ken Long, S. Kelley, D. Cochran","doi":"10.1109/PCIC30934.2019.9074538","DOIUrl":null,"url":null,"abstract":"In many refineries and petrochemical plants, electrical equipment can only be replaced during a turnaround. The turnaround length and work space are key factors for work that can be accomplished within a finite time frame. This paper describes the project execution to successfully complete the scope of work in the allotted time. At an Olefins plant on the Texas Gulf Coast, a large amount of electrical equipment was removed and installed at six different locations during a 35-day turnaround window. The electrical equipment included four 15kV switchgear lineups, seven medium voltage motor control centers and high resistance grounding systems, five 15-kV switchgear relay door upgrades, 21,000 feet of fiber, four battery banks, two capacitor switching devices, four automation controllers, and four 15-kV feeder cables. The project execution topics covered are engineering, procurement, expediting, planning, pre-turnaround staging, and support, as well as the challenges discovered prior to and during the turnaround and how the team resolved the challenges.","PeriodicalId":276673,"journal":{"name":"2019 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Successful Project Execution to Replace Four 15-KV Switchgear Lineups and Seven Medium Voltage Motor Control Centers During a 35-Day Turnaround - A Case Study\",\"authors\":\"Jacqueline Morris, Ken Long, S. Kelley, D. Cochran\",\"doi\":\"10.1109/PCIC30934.2019.9074538\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In many refineries and petrochemical plants, electrical equipment can only be replaced during a turnaround. The turnaround length and work space are key factors for work that can be accomplished within a finite time frame. This paper describes the project execution to successfully complete the scope of work in the allotted time. At an Olefins plant on the Texas Gulf Coast, a large amount of electrical equipment was removed and installed at six different locations during a 35-day turnaround window. The electrical equipment included four 15kV switchgear lineups, seven medium voltage motor control centers and high resistance grounding systems, five 15-kV switchgear relay door upgrades, 21,000 feet of fiber, four battery banks, two capacitor switching devices, four automation controllers, and four 15-kV feeder cables. The project execution topics covered are engineering, procurement, expediting, planning, pre-turnaround staging, and support, as well as the challenges discovered prior to and during the turnaround and how the team resolved the challenges.\",\"PeriodicalId\":276673,\"journal\":{\"name\":\"2019 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCIC30934.2019.9074538\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE Petroleum and Chemical Industry Committee Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCIC30934.2019.9074538","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在许多炼油厂和石化厂,电气设备只能在周转期间更换。周转时间和工作空间是在有限时间内完成工作的关键因素。本文描述了项目执行在规定的时间内顺利完成范围内的工作。在德克萨斯州墨西哥湾沿岸的一家烯烃工厂,在35天的周转期内,大量电气设备被拆除并安装在六个不同的位置。电气设备包括4个15kV开关柜、7个中压电机控制中心和高阻接地系统、5个15kV开关柜继电器门升级、21,000英尺的光纤、4个电池组、2个电容器开关装置、4个自动化控制器和4条15kV馈线电缆。涵盖的项目执行主题包括工程、采购、加速、计划、周转前阶段和支持,以及在周转之前和期间发现的挑战,以及团队如何解决这些挑战。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Successful Project Execution to Replace Four 15-KV Switchgear Lineups and Seven Medium Voltage Motor Control Centers During a 35-Day Turnaround - A Case Study
In many refineries and petrochemical plants, electrical equipment can only be replaced during a turnaround. The turnaround length and work space are key factors for work that can be accomplished within a finite time frame. This paper describes the project execution to successfully complete the scope of work in the allotted time. At an Olefins plant on the Texas Gulf Coast, a large amount of electrical equipment was removed and installed at six different locations during a 35-day turnaround window. The electrical equipment included four 15kV switchgear lineups, seven medium voltage motor control centers and high resistance grounding systems, five 15-kV switchgear relay door upgrades, 21,000 feet of fiber, four battery banks, two capacitor switching devices, four automation controllers, and four 15-kV feeder cables. The project execution topics covered are engineering, procurement, expediting, planning, pre-turnaround staging, and support, as well as the challenges discovered prior to and during the turnaround and how the team resolved the challenges.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信