第三方的干扰:输油管道路权上公路建设的挑战——以autoistas Del Nordeste-Ocensa为例

Corrales Cobos, Julian Javier
{"title":"第三方的干扰:输油管道路权上公路建设的挑战——以autoistas Del Nordeste-Ocensa为例","authors":"Corrales Cobos, Julian Javier","doi":"10.1115/ipg2019-5313","DOIUrl":null,"url":null,"abstract":"\n The development of third world countries is surrounded by a thousand challenges, one of them is to increase and modernize the transport infrastructure to improve competitiveness in an increasingly interconnected world. Colombia in recent years has undertaken a titanic task of construction of highways to meet this purpose, have hired more than 8170 km of roads, however, this task generates a major challenge for the oil industry since the construction of these roads generates an unplanned interference with the hydrocarbon transport infrastructure that, if not handled correctly, can cause ruptures or damage in the pipelines and the consequent economic and environmental losses.\n In 2015 the design of the highway that interconnects the municipalities of Remedios and Caucasia in the department of Antioquia began. This project was called Autopistas del Nordeste. The road was designed to pass through the Pocune river valley, however, the environmental licensing of this type of project requires the revision of the interference with other networks. It was found that the new road crossed the Ocensa pipeline at 26 points. The geographical conditions require the use of this small corridor by many lines, 2 pipelines (Ocensa and ODC), a 500 KV power line and, of course, the current tertiary route and the projected highway that connects these municipalities. The challenge is huge, in this article the project is described, the negotiation stages that have been necessary to carry out with the way to make compatible the projects and the threats that have been overcome in the constructive stage.","PeriodicalId":325632,"journal":{"name":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","volume":"161 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Interferences by Third Parties: The Challenge of the Construction of Highways on the Right of Way of Oil Pipelines — Case of Autopistas Del Nordeste-Ocensa\",\"authors\":\"Corrales Cobos, Julian Javier\",\"doi\":\"10.1115/ipg2019-5313\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The development of third world countries is surrounded by a thousand challenges, one of them is to increase and modernize the transport infrastructure to improve competitiveness in an increasingly interconnected world. Colombia in recent years has undertaken a titanic task of construction of highways to meet this purpose, have hired more than 8170 km of roads, however, this task generates a major challenge for the oil industry since the construction of these roads generates an unplanned interference with the hydrocarbon transport infrastructure that, if not handled correctly, can cause ruptures or damage in the pipelines and the consequent economic and environmental losses.\\n In 2015 the design of the highway that interconnects the municipalities of Remedios and Caucasia in the department of Antioquia began. This project was called Autopistas del Nordeste. The road was designed to pass through the Pocune river valley, however, the environmental licensing of this type of project requires the revision of the interference with other networks. It was found that the new road crossed the Ocensa pipeline at 26 points. The geographical conditions require the use of this small corridor by many lines, 2 pipelines (Ocensa and ODC), a 500 KV power line and, of course, the current tertiary route and the projected highway that connects these municipalities. The challenge is huge, in this article the project is described, the negotiation stages that have been necessary to carry out with the way to make compatible the projects and the threats that have been overcome in the constructive stage.\",\"PeriodicalId\":325632,\"journal\":{\"name\":\"ASME-ARPEL 2019 International Pipeline Geotechnical Conference\",\"volume\":\"161 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ASME-ARPEL 2019 International Pipeline Geotechnical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/ipg2019-5313\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ASME-ARPEL 2019 International Pipeline Geotechnical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ipg2019-5313","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

第三世界国家的发展面临着无数的挑战,其中之一是增加和现代化交通基础设施,以提高竞争力,在日益相互联系的世界。为了达到这一目的,哥伦比亚近年来承担了建设高速公路的艰巨任务,已租用了8170多公里的公路,然而,这项任务对石油工业构成了重大挑战,因为这些公路的建设对碳氢化合物运输基础设施产生了计划外的干扰,如果处理不当,可能导致管道破裂或损坏,从而造成经济和环境损失。2015年,连接安蒂奥基亚省雷麦黛斯市和高加索市的高速公路开始设计。这个项目被称为Autopistas del Nordeste。这条道路的设计目的是穿过Pocune河流域,然而,这类项目的环境许可要求修改与其他网络的干扰。据发现,这条新路在26个点上穿过了Ocensa管道。地理条件要求许多线路使用这条小走廊,两条管道(Ocensa和ODC),一条500千伏电力线,当然还有目前的三级线路和连接这些城市的计划高速公路。挑战是巨大的,在这篇文章中,项目被描述,已经有必要进行的谈判阶段,使项目兼容的方式和在建设性阶段已经克服的威胁。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Interferences by Third Parties: The Challenge of the Construction of Highways on the Right of Way of Oil Pipelines — Case of Autopistas Del Nordeste-Ocensa
The development of third world countries is surrounded by a thousand challenges, one of them is to increase and modernize the transport infrastructure to improve competitiveness in an increasingly interconnected world. Colombia in recent years has undertaken a titanic task of construction of highways to meet this purpose, have hired more than 8170 km of roads, however, this task generates a major challenge for the oil industry since the construction of these roads generates an unplanned interference with the hydrocarbon transport infrastructure that, if not handled correctly, can cause ruptures or damage in the pipelines and the consequent economic and environmental losses. In 2015 the design of the highway that interconnects the municipalities of Remedios and Caucasia in the department of Antioquia began. This project was called Autopistas del Nordeste. The road was designed to pass through the Pocune river valley, however, the environmental licensing of this type of project requires the revision of the interference with other networks. It was found that the new road crossed the Ocensa pipeline at 26 points. The geographical conditions require the use of this small corridor by many lines, 2 pipelines (Ocensa and ODC), a 500 KV power line and, of course, the current tertiary route and the projected highway that connects these municipalities. The challenge is huge, in this article the project is described, the negotiation stages that have been necessary to carry out with the way to make compatible the projects and the threats that have been overcome in the constructive stage.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信