应对巴基斯坦海岸的局部海啸

G. Naeem
{"title":"应对巴基斯坦海岸的局部海啸","authors":"G. Naeem","doi":"10.5772/intechopen.91279","DOIUrl":null,"url":null,"abstract":"Tsunami originating from a local source can arrive at Pakistan coastline within minutes. In the absence of a comprehensive and well-coordinated management plan, the fast-approaching tsunami might wreak havoc on the coast. To combat such a threat, a wide range of short- and long-term mitigation measures are needed to be taken by several government and private sector organizations as well as security agencies. Around 1000-km coastline is divided administratively into two provinces of Baluchistan and Sindh and further into seven districts. Most of the coastal communities were severely affected by an earthquake of magnitude 8+ on 28 November 1945 followed by a devastating tsunami. In contrast to the level of posed hazard and multiple-fold increase in vulnerabilities since then, the risk mitigation efforts are trivial and least coordinated. It is important to provide stakeholders with a set of prerequisite information and guidelines on standardized format to develop their organizational strategies and course of action for earthquake and tsunami risk mitigation in a well-coordinated manner, from local to the national level.","PeriodicalId":398089,"journal":{"name":"Tsunami - Damage Assessment and Medical Triage","volume":"167 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Dealing with Local Tsunami on Pakistan Coast\",\"authors\":\"G. Naeem\",\"doi\":\"10.5772/intechopen.91279\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Tsunami originating from a local source can arrive at Pakistan coastline within minutes. In the absence of a comprehensive and well-coordinated management plan, the fast-approaching tsunami might wreak havoc on the coast. To combat such a threat, a wide range of short- and long-term mitigation measures are needed to be taken by several government and private sector organizations as well as security agencies. Around 1000-km coastline is divided administratively into two provinces of Baluchistan and Sindh and further into seven districts. Most of the coastal communities were severely affected by an earthquake of magnitude 8+ on 28 November 1945 followed by a devastating tsunami. In contrast to the level of posed hazard and multiple-fold increase in vulnerabilities since then, the risk mitigation efforts are trivial and least coordinated. It is important to provide stakeholders with a set of prerequisite information and guidelines on standardized format to develop their organizational strategies and course of action for earthquake and tsunami risk mitigation in a well-coordinated manner, from local to the national level.\",\"PeriodicalId\":398089,\"journal\":{\"name\":\"Tsunami - Damage Assessment and Medical Triage\",\"volume\":\"167 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tsunami - Damage Assessment and Medical Triage\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5772/intechopen.91279\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tsunami - Damage Assessment and Medical Triage","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5772/intechopen.91279","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

源自当地的海啸可以在几分钟内到达巴基斯坦海岸线。如果没有一个全面和协调的管理计划,快速逼近的海啸可能会对海岸造成严重破坏。为了应对这一威胁,一些政府和私营部门组织以及安全机构需要采取一系列广泛的短期和长期缓解措施。大约1000公里的海岸线在行政上分为俾路支省和信德省两个省,并进一步分为七个区。1945年11月28日,大部分沿海社区受到8+级地震的严重影响,随后发生了毁灭性的海啸。与自那时以来造成的危害程度和脆弱性成倍增加相比,减轻风险的努力微不足道,协调程度最低。必须向利益攸关方提供一套关于标准化格式的先决条件信息和准则,以便从地方到国家以良好协调的方式制定减轻地震和海啸风险的组织战略和行动方针。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dealing with Local Tsunami on Pakistan Coast
Tsunami originating from a local source can arrive at Pakistan coastline within minutes. In the absence of a comprehensive and well-coordinated management plan, the fast-approaching tsunami might wreak havoc on the coast. To combat such a threat, a wide range of short- and long-term mitigation measures are needed to be taken by several government and private sector organizations as well as security agencies. Around 1000-km coastline is divided administratively into two provinces of Baluchistan and Sindh and further into seven districts. Most of the coastal communities were severely affected by an earthquake of magnitude 8+ on 28 November 1945 followed by a devastating tsunami. In contrast to the level of posed hazard and multiple-fold increase in vulnerabilities since then, the risk mitigation efforts are trivial and least coordinated. It is important to provide stakeholders with a set of prerequisite information and guidelines on standardized format to develop their organizational strategies and course of action for earthquake and tsunami risk mitigation in a well-coordinated manner, from local to the national level.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信