从工业设施发电机跳闸事件中吸取的教训

C. Mozina
{"title":"从工业设施发电机跳闸事件中吸取的教训","authors":"C. Mozina","doi":"10.1109/PCICON.2008.4663968","DOIUrl":null,"url":null,"abstract":"This paper relates a number of generator tripping events that occurred within industrial plants in the hope that the “lessons learned” will help others avoid the events described. In many cases, these failures involved human errors and could have been avoided with proper generator protection or personnel training. In a number of cases, plant operators contributed or caused the events. These events were captured on oscillographs. The paper discusses the subtleties of analyzing generator non-fault events such as loss-of-field as well as the important role that sequence of event and oscillographic records play in analyzing these events. The paper also discusses the need to change the established practice of low-resistance grounding (200–400 A) of medium voltage industrial generators. In-service failures indicate the need to limit generator ground current to much lower levels to avoid catastrophic damage. The use of hybrid generator grounding is proposed as a solution to this problem.","PeriodicalId":217420,"journal":{"name":"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference","volume":"27 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Lessons learned from generator tripping events at industrial facilities\",\"authors\":\"C. Mozina\",\"doi\":\"10.1109/PCICON.2008.4663968\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper relates a number of generator tripping events that occurred within industrial plants in the hope that the “lessons learned” will help others avoid the events described. In many cases, these failures involved human errors and could have been avoided with proper generator protection or personnel training. In a number of cases, plant operators contributed or caused the events. These events were captured on oscillographs. The paper discusses the subtleties of analyzing generator non-fault events such as loss-of-field as well as the important role that sequence of event and oscillographic records play in analyzing these events. The paper also discusses the need to change the established practice of low-resistance grounding (200–400 A) of medium voltage industrial generators. In-service failures indicate the need to limit generator ground current to much lower levels to avoid catastrophic damage. The use of hybrid generator grounding is proposed as a solution to this problem.\",\"PeriodicalId\":217420,\"journal\":{\"name\":\"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference\",\"volume\":\"27 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCICON.2008.4663968\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2009 Annual Pulp and Paper Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2008.4663968","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一些发生在工业厂房内的发电机跳闸事件,希望从中吸取的经验教训能帮助其他人避免所描述的事件。在许多情况下,这些故障涉及人为错误,可以通过适当的发电机保护或人员培训来避免。在许多情况下,核电站操作员促成或导致了这些事件。这些事件被记录在示波器上。本文讨论了分析发电机非故障事件(如场损失)的微妙之处,以及事件序列和示波器记录在分析这些事件中所起的重要作用。本文还讨论了改变中压工业发电机低阻接地(200 - 400a)惯例的必要性。运行中的故障表明需要将发电机接地电流限制在更低的水平,以避免灾难性的损坏。提出了采用混合式发电机接地的方法来解决这一问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Lessons learned from generator tripping events at industrial facilities
This paper relates a number of generator tripping events that occurred within industrial plants in the hope that the “lessons learned” will help others avoid the events described. In many cases, these failures involved human errors and could have been avoided with proper generator protection or personnel training. In a number of cases, plant operators contributed or caused the events. These events were captured on oscillographs. The paper discusses the subtleties of analyzing generator non-fault events such as loss-of-field as well as the important role that sequence of event and oscillographic records play in analyzing these events. The paper also discusses the need to change the established practice of low-resistance grounding (200–400 A) of medium voltage industrial generators. In-service failures indicate the need to limit generator ground current to much lower levels to avoid catastrophic damage. The use of hybrid generator grounding is proposed as a solution to this problem.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信