{"title":"在具有相当高坡度的高速公路上,输油管容量适中的研究(火山口街、Bondowoso案例研究)","authors":"Noor Salim","doi":"10.33084/mits.v9i2.2080","DOIUrl":null,"url":null,"abstract":"Stagnant water in the highway area is the cause of disruption of the smooth flow of vehicle traffic. Even the overflowing of air from the road creates a large flood supply in the road area. The problem of flooding in the Ijen Bondowoso crater road area was also triggered by the inability of the channel that functions to fill the flood water discharge that occurs in this road area. From this problem, it is necessary to study regarding the adequacy of the capacity of the road channel on roads with a fairly high slope such as what happened in the area of Ijen Crater road, Bondowoso From the results of this study it can be seen that the average daily rainfall is the result of 100,461 mm and the relative average rainfall intensity of each channel for the 10 year return period is 63,301 mm / hour. The flood discharge plan is calculated from 2 to 100 years. In this drainage design analysis, the design flood discharge is calculated for only 10 years, and a planned flood discharge is obtained of 0.423 m3 / second. The channel required to fill the flood discharge is a rectangular channel with the size B = H = 0.6 m. It is recommended to always carry out a comprehensive study with regard to changes in the road body of the road along with the increase in existing traffic. As well as the infrastructure of the existing channel and feeding the community around the road, it will be clean and not littering, especially in the road channel","PeriodicalId":380506,"journal":{"name":"Media Ilmiah Teknik Sipil","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Studi Ketercukupan Kapasitas Saluran Jalan Pada Jalan Dengan Kelandaian Cukup Tinggi (Studi Kasus Jalan Kawah Ijen, Bondowoso)\",\"authors\":\"Noor Salim\",\"doi\":\"10.33084/mits.v9i2.2080\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Stagnant water in the highway area is the cause of disruption of the smooth flow of vehicle traffic. Even the overflowing of air from the road creates a large flood supply in the road area. The problem of flooding in the Ijen Bondowoso crater road area was also triggered by the inability of the channel that functions to fill the flood water discharge that occurs in this road area. From this problem, it is necessary to study regarding the adequacy of the capacity of the road channel on roads with a fairly high slope such as what happened in the area of Ijen Crater road, Bondowoso From the results of this study it can be seen that the average daily rainfall is the result of 100,461 mm and the relative average rainfall intensity of each channel for the 10 year return period is 63,301 mm / hour. The flood discharge plan is calculated from 2 to 100 years. In this drainage design analysis, the design flood discharge is calculated for only 10 years, and a planned flood discharge is obtained of 0.423 m3 / second. The channel required to fill the flood discharge is a rectangular channel with the size B = H = 0.6 m. It is recommended to always carry out a comprehensive study with regard to changes in the road body of the road along with the increase in existing traffic. As well as the infrastructure of the existing channel and feeding the community around the road, it will be clean and not littering, especially in the road channel\",\"PeriodicalId\":380506,\"journal\":{\"name\":\"Media Ilmiah Teknik Sipil\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Media Ilmiah Teknik Sipil\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33084/mits.v9i2.2080\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Media Ilmiah Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33084/mits.v9i2.2080","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
高速公路区域的积水是扰乱车辆通行的原因。甚至从道路上溢出的空气也会在道路区域产生大量的洪水供应。Ijen Bondowoso火山口道路地区的洪水问题也是由于无法填补该道路地区的洪水排放而引发的。从这个问题来看,有必要研究道路通道在像Ijen Crater road, Bondowoso这样坡度较大的道路上的通行能力是否足够。从本研究的结果可以看出,平均日降雨量为100,461 mm,各通道10年回归期的相对平均降雨强度为63,301 mm / h。泄洪计划按2 ~ 100年计算。在本次排水设计分析中,设计洪流量仅计算10年,得到的规划洪流量为0.423 m3 / s。填洪通道为矩形通道,尺寸为B = H = 0.6 m。建议始终对道路的道路体随着现有交通量的增加而发生的变化进行全面研究。以及现有的基础设施渠道和喂养社区周围的道路,它将是干净的,不乱扔垃圾,特别是在道路渠道
Studi Ketercukupan Kapasitas Saluran Jalan Pada Jalan Dengan Kelandaian Cukup Tinggi (Studi Kasus Jalan Kawah Ijen, Bondowoso)
Stagnant water in the highway area is the cause of disruption of the smooth flow of vehicle traffic. Even the overflowing of air from the road creates a large flood supply in the road area. The problem of flooding in the Ijen Bondowoso crater road area was also triggered by the inability of the channel that functions to fill the flood water discharge that occurs in this road area. From this problem, it is necessary to study regarding the adequacy of the capacity of the road channel on roads with a fairly high slope such as what happened in the area of Ijen Crater road, Bondowoso From the results of this study it can be seen that the average daily rainfall is the result of 100,461 mm and the relative average rainfall intensity of each channel for the 10 year return period is 63,301 mm / hour. The flood discharge plan is calculated from 2 to 100 years. In this drainage design analysis, the design flood discharge is calculated for only 10 years, and a planned flood discharge is obtained of 0.423 m3 / second. The channel required to fill the flood discharge is a rectangular channel with the size B = H = 0.6 m. It is recommended to always carry out a comprehensive study with regard to changes in the road body of the road along with the increase in existing traffic. As well as the infrastructure of the existing channel and feeding the community around the road, it will be clean and not littering, especially in the road channel