{"title":"中环大动脉/第三海底隧道工程营运控制中心的操作员控制台工作站的设计及实施","authors":"C. T. Marcus, R. Stack","doi":"10.1109/VNIS.1995.518828","DOIUrl":null,"url":null,"abstract":"This paper presents how task analysis, standard operating procedures, and interface prototyping have been used in the design and implementation of the Operator Console Workstations at the Central Artery/Third Harbor Tunnel project's operations control center. Each of these three elements has played a key role in ensuring that the final operator interface to a complex control system is one which is robust, user-friendly, and minimizes the risk of operator error.","PeriodicalId":337008,"journal":{"name":"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future","volume":"184 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The design and implementation of the operator console workstations at the Central Artery/Third Harbor Tunnel project's operations control center\",\"authors\":\"C. T. Marcus, R. Stack\",\"doi\":\"10.1109/VNIS.1995.518828\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents how task analysis, standard operating procedures, and interface prototyping have been used in the design and implementation of the Operator Console Workstations at the Central Artery/Third Harbor Tunnel project's operations control center. Each of these three elements has played a key role in ensuring that the final operator interface to a complex control system is one which is robust, user-friendly, and minimizes the risk of operator error.\",\"PeriodicalId\":337008,\"journal\":{\"name\":\"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future\",\"volume\":\"184 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/VNIS.1995.518828\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pacific Rim TransTech Conference. 1995 Vehicle Navigation and Information Systems Conference Proceedings. 6th International VNIS. A Ride into the Future","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/VNIS.1995.518828","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The design and implementation of the operator console workstations at the Central Artery/Third Harbor Tunnel project's operations control center
This paper presents how task analysis, standard operating procedures, and interface prototyping have been used in the design and implementation of the Operator Console Workstations at the Central Artery/Third Harbor Tunnel project's operations control center. Each of these three elements has played a key role in ensuring that the final operator interface to a complex control system is one which is robust, user-friendly, and minimizes the risk of operator error.