津巴布韦的土地补偿与土地冲突解决:第二共和国与西方关系的挑战与前景

Pedzisai Sixpence, P. Chigora
{"title":"津巴布韦的土地补偿与土地冲突解决:第二共和国与西方关系的挑战与前景","authors":"Pedzisai Sixpence, P. Chigora","doi":"10.55190/rwfp7026","DOIUrl":null,"url":null,"abstract":"On 29 July 2020, the government of Zimbabwe and representatives of the former white farmers signed the Global Compensation Agreement (GCA) in which the government committed to paying a total of USD3.5billion to the farmers for the developments instituted on the farms before the Fast Track Land Reform Programme (FTLRP). The deal was guided by section 72(3) of the 2013 constitution of Zimbabwe. The GCA provides for the establishment of various joint committees for the evaluation of the developments in question, the fundraising process and the payment procedures. While this is seen as being a show of commitment by the government of Zimbabwe to close the land chapter amicably, there are mixed voices on the development notwithstanding that the decision was accepted by 94.49% of Zimbabweans who voted in the 2013 referendum (ZEC 2013). It is, therefore, the purpose of this article is to look at the challenges and prospects of the land compensation agreement as a conflict resolution move pursued by Zimbabwe’s second republic and its implications for relations with western countries and institutions. To achieve this, the article depended upon both primary and secondary sources of qualitative research. The primary sources used in this article are mainly the pieces of legislations (both colonial and post-colonial), reports by various commissions and the Zimbabwe constitution. Secondary sources, mainly published material, media reports, official institutional reports and websites, and interviews were used in this research. Keywords: Conflict resolution, Land compensation, Land reform, Second republic.","PeriodicalId":179506,"journal":{"name":"Journal of Public Administration and Development Alternatives","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"LAND COMPENSATION AND LAND CONFLICT RESOLUTION IN ZIMBABWE: CHALLENGES AND PROSPECTS FOR THE SECOND REPUBLIC’S RELATIONS WITH THE WEST\",\"authors\":\"Pedzisai Sixpence, P. Chigora\",\"doi\":\"10.55190/rwfp7026\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"On 29 July 2020, the government of Zimbabwe and representatives of the former white farmers signed the Global Compensation Agreement (GCA) in which the government committed to paying a total of USD3.5billion to the farmers for the developments instituted on the farms before the Fast Track Land Reform Programme (FTLRP). The deal was guided by section 72(3) of the 2013 constitution of Zimbabwe. The GCA provides for the establishment of various joint committees for the evaluation of the developments in question, the fundraising process and the payment procedures. While this is seen as being a show of commitment by the government of Zimbabwe to close the land chapter amicably, there are mixed voices on the development notwithstanding that the decision was accepted by 94.49% of Zimbabweans who voted in the 2013 referendum (ZEC 2013). It is, therefore, the purpose of this article is to look at the challenges and prospects of the land compensation agreement as a conflict resolution move pursued by Zimbabwe’s second republic and its implications for relations with western countries and institutions. To achieve this, the article depended upon both primary and secondary sources of qualitative research. The primary sources used in this article are mainly the pieces of legislations (both colonial and post-colonial), reports by various commissions and the Zimbabwe constitution. Secondary sources, mainly published material, media reports, official institutional reports and websites, and interviews were used in this research. Keywords: Conflict resolution, Land compensation, Land reform, Second republic.\",\"PeriodicalId\":179506,\"journal\":{\"name\":\"Journal of Public Administration and Development Alternatives\",\"volume\":\"22 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Public Administration and Development Alternatives\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55190/rwfp7026\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Public Administration and Development Alternatives","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55190/rwfp7026","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2020年7月29日,津巴布韦政府与前白人农民代表签署了《全球补偿协议》(GCA),其中政府承诺向农民支付总计35亿美元,用于在快速通道土地改革计划(FTLRP)之前在农场进行的开发。该协议以津巴布韦2013年宪法第72(3)条为指导。GCA规定设立各种联合委员会,以评价有关的事态发展、筹资过程和付款程序。虽然这被视为津巴布韦政府承诺友好地结束土地章节的表现,但尽管在2013年全民公决中投票的94.49%的津巴布韦人接受了这一决定,但对这一发展仍有不同的声音。因此,本文的目的是研究作为津巴布韦第二共和国所追求的冲突解决举措的土地补偿协议的挑战和前景,以及它对与西方国家和机构关系的影响。为了实现这一目标,本文依赖于定性研究的主要和次要来源。本文使用的主要资料来源主要是立法(包括殖民时期和后殖民时期)、各委员会的报告和津巴布韦宪法。本研究主要使用了二手资料,主要是出版物、媒体报道、官方机构报告和网站以及访谈。关键词:冲突解决,土地补偿,土地改革,第二共和国
本文章由计算机程序翻译,如有差异,请以英文原文为准。
LAND COMPENSATION AND LAND CONFLICT RESOLUTION IN ZIMBABWE: CHALLENGES AND PROSPECTS FOR THE SECOND REPUBLIC’S RELATIONS WITH THE WEST
On 29 July 2020, the government of Zimbabwe and representatives of the former white farmers signed the Global Compensation Agreement (GCA) in which the government committed to paying a total of USD3.5billion to the farmers for the developments instituted on the farms before the Fast Track Land Reform Programme (FTLRP). The deal was guided by section 72(3) of the 2013 constitution of Zimbabwe. The GCA provides for the establishment of various joint committees for the evaluation of the developments in question, the fundraising process and the payment procedures. While this is seen as being a show of commitment by the government of Zimbabwe to close the land chapter amicably, there are mixed voices on the development notwithstanding that the decision was accepted by 94.49% of Zimbabweans who voted in the 2013 referendum (ZEC 2013). It is, therefore, the purpose of this article is to look at the challenges and prospects of the land compensation agreement as a conflict resolution move pursued by Zimbabwe’s second republic and its implications for relations with western countries and institutions. To achieve this, the article depended upon both primary and secondary sources of qualitative research. The primary sources used in this article are mainly the pieces of legislations (both colonial and post-colonial), reports by various commissions and the Zimbabwe constitution. Secondary sources, mainly published material, media reports, official institutional reports and websites, and interviews were used in this research. Keywords: Conflict resolution, Land compensation, Land reform, Second republic.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信