基于时间效率的建筑信息建模概念及其在建筑改造阶段的应用

Ardhiana Muhsin Machdi
{"title":"基于时间效率的建筑信息建模概念及其在建筑改造阶段的应用","authors":"Ardhiana Muhsin Machdi","doi":"10.17509/jare.v1i2.22303","DOIUrl":null,"url":null,"abstract":"Abstract—Nowadays Building Information Modeling, known as BIM has become a common topic in construction technology. Indonesian government has even accelerated the implementation of BIM as a requirement in planning above 2000 m2 since year 2018. The word renovation in BIM life cycle means one of the post-project building phases after maintenance, rehabilitation but before reach demolition phases as an ending of the building. On the other hand, renovation is not a strange thing for the Indonesian people and has direct meaning to its activity. Even though occupying a new property, there is always a tendency to change, add or even reduce some parts of existing buildings. Renovation is also unavoidable when there is a change in function in a building and it can be classified as adaptive reuse as part of the concept of sustainable building, a preservation and rehabilitation of an old building that has unique design or contains certain historical significance. This research is structured and focuses more on the issue of time efficiency which is very significant in the renovation stage. The method used in the form of a comparison between conventional methods with methods that apply the BIM concept. This is interesting to be observed as the benefits of research so that the concept of BIM can be understood and seen its real advantages.Keywords—building information modeling, renovation, efficiency","PeriodicalId":221583,"journal":{"name":"Journal of Architectural Research and Education","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Building Information Modeling Concept And Its Application in Building Renovation Stage In Term Of Time Efficiency\",\"authors\":\"Ardhiana Muhsin Machdi\",\"doi\":\"10.17509/jare.v1i2.22303\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract—Nowadays Building Information Modeling, known as BIM has become a common topic in construction technology. Indonesian government has even accelerated the implementation of BIM as a requirement in planning above 2000 m2 since year 2018. The word renovation in BIM life cycle means one of the post-project building phases after maintenance, rehabilitation but before reach demolition phases as an ending of the building. On the other hand, renovation is not a strange thing for the Indonesian people and has direct meaning to its activity. Even though occupying a new property, there is always a tendency to change, add or even reduce some parts of existing buildings. Renovation is also unavoidable when there is a change in function in a building and it can be classified as adaptive reuse as part of the concept of sustainable building, a preservation and rehabilitation of an old building that has unique design or contains certain historical significance. This research is structured and focuses more on the issue of time efficiency which is very significant in the renovation stage. The method used in the form of a comparison between conventional methods with methods that apply the BIM concept. This is interesting to be observed as the benefits of research so that the concept of BIM can be understood and seen its real advantages.Keywords—building information modeling, renovation, efficiency\",\"PeriodicalId\":221583,\"journal\":{\"name\":\"Journal of Architectural Research and Education\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Architectural Research and Education\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.17509/jare.v1i2.22303\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Architectural Research and Education","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.17509/jare.v1i2.22303","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

摘要:建筑信息模型(BIM)已成为当今建筑技术领域的热门话题。自2018年以来,印度尼西亚政府甚至加快了BIM的实施,将其作为2000平方米以上规划的要求。BIM生命周期中的翻新一词是指在维护、修复之后,但在达到拆除阶段之前的项目后建筑阶段之一,作为建筑的结束。另一方面,翻新对印尼人来说并不陌生,对其活动具有直接意义。即使占用了一个新的物业,也总是倾向于改变,增加甚至减少现有建筑的某些部分。当建筑物的功能发生变化时,翻新也是不可避免的,它可以被归类为适应性再利用,作为可持续建筑概念的一部分,是对具有独特设计或具有一定历史意义的旧建筑的保存和修复。本研究是结构化的,更多地关注时间效率问题,这在改造阶段是非常重要的。该方法以比较传统方法与应用BIM概念的方法的形式使用。这是有趣的观察作为研究的好处,使BIM的概念可以理解,并看到其真正的优势。关键词:建筑信息建模,改造,效率
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Building Information Modeling Concept And Its Application in Building Renovation Stage In Term Of Time Efficiency
Abstract—Nowadays Building Information Modeling, known as BIM has become a common topic in construction technology. Indonesian government has even accelerated the implementation of BIM as a requirement in planning above 2000 m2 since year 2018. The word renovation in BIM life cycle means one of the post-project building phases after maintenance, rehabilitation but before reach demolition phases as an ending of the building. On the other hand, renovation is not a strange thing for the Indonesian people and has direct meaning to its activity. Even though occupying a new property, there is always a tendency to change, add or even reduce some parts of existing buildings. Renovation is also unavoidable when there is a change in function in a building and it can be classified as adaptive reuse as part of the concept of sustainable building, a preservation and rehabilitation of an old building that has unique design or contains certain historical significance. This research is structured and focuses more on the issue of time efficiency which is very significant in the renovation stage. The method used in the form of a comparison between conventional methods with methods that apply the BIM concept. This is interesting to be observed as the benefits of research so that the concept of BIM can be understood and seen its real advantages.Keywords—building information modeling, renovation, efficiency
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信