Endang Widjajanti, Muhammad Iqbal
{"title":"Konsumsi Bahan Bakar Akibat Buka Tutup Arus Lalu Lintas pada Jalan. Jl. Bts. Kota Lhokseumawe, Aceh Utara – Lhoksukon Km. 280 Provinsi Nanggroe Aceh Darussalam","authors":"Endang Widjajanti, Muhammad Iqbal","doi":"10.35334/be.v1i2.2468","DOIUrl":null,"url":null,"abstract":"This study aims to determine the effect of vehicle queues on fuel consumption due to the opening and closing of traffic flows caused by drainage channels project throughout October 2020 on. Jalan. Bts. Lhokseumawe City/North Aceh – Lhoksukon Km. 280. The queue length analysis was calculated based on vehicle traffic flow in locations that have not been affected by the existence of open/close traffic flow activities and analysis of fuel consumption based on the length of delay and the number of vehicle queues using LAPI-ITB formula. The results showed that the queue of vehicles due to opening and closing of vehicle lanes for 6 hours (12.00 – 18.00 WIB) on holidays was 23% larger than the queue on weekdays. Vehicle queues for 6 hours on holidays cause additional vehicle fuel consumption for light vehicles (LV) of 424,15 liters, heavy vehicles (HV) of 53,09 liters, and motorcycles (MC) of 203,24 liters and  on weekdays causes additional fuel consumption for light vehicles (LV) as much as 342,66 liters, Heavy vehicles (HV) as much as 35,85 liters, and motorcycles (MC) as much as 203,24 liters.  Loss of fuel use due to queues caused by opening and closing roads on Jalan. Bts. Lhokseumawe City/North Aceh – Lhoksukon Km. 280 for 6 hours (12.00 – 18.00 WIB) on weekdays is 4.402.185,00 and on holidays it is Rp. 5.541.065,00.","PeriodicalId":155505,"journal":{"name":"Borneo Engineering : Jurnal Teknik Sipil","volume":"64 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Borneo Engineering : Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.35334/be.v1i2.2468","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究旨在确定2020年10月至2020年10月期间排水渠工程造成的交通流量的开放和关闭对车辆排队对燃油消耗的影响。道路。Bts。Lhokseumawe市/北亚齐- Lhoksukon 280公里。队列长度分析基于未受开/闭交通流活动影响的地点的车辆交通流量,并使用LAPI-ITB公式分析基于延迟长度和车辆队列数量的燃油消耗。结果表明:节假日6小时(12.00 ~ 18.00 WIB)的开合车道导致的车辆排队比平日多出23%;节假日车辆排队6小时,轻型车辆(LV)的额外油耗为424,15升,重型车辆(HV)的额外油耗为53,09升,摩托车(MC)的额外油耗为203,24升,工作日轻型车辆(LV)的额外油耗为342,66升,重型车辆(HV)的额外油耗为35,85升,摩托车(MC)的额外油耗为203,24升。由于嘉兰道路的开放和关闭而造成的排队造成的燃料消耗损失。Bts。Lhokseumawe市/北亚齐- Lhoksukon Km. 280,工作日6小时(中午12点至下午18点)的价格为4.402.18.5万卢比,假期为5.541.065万卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Konsumsi Bahan Bakar Akibat Buka Tutup Arus Lalu Lintas pada Jalan. Jl. Bts. Kota Lhokseumawe, Aceh Utara – Lhoksukon Km. 280 Provinsi Nanggroe Aceh Darussalam
This study aims to determine the effect of vehicle queues on fuel consumption due to the opening and closing of traffic flows caused by drainage channels project throughout October 2020 on. Jalan. Bts. Lhokseumawe City/North Aceh – Lhoksukon Km. 280. The queue length analysis was calculated based on vehicle traffic flow in locations that have not been affected by the existence of open/close traffic flow activities and analysis of fuel consumption based on the length of delay and the number of vehicle queues using LAPI-ITB formula. The results showed that the queue of vehicles due to opening and closing of vehicle lanes for 6 hours (12.00 – 18.00 WIB) on holidays was 23% larger than the queue on weekdays. Vehicle queues for 6 hours on holidays cause additional vehicle fuel consumption for light vehicles (LV) of 424,15 liters, heavy vehicles (HV) of 53,09 liters, and motorcycles (MC) of 203,24 liters and  on weekdays causes additional fuel consumption for light vehicles (LV) as much as 342,66 liters, Heavy vehicles (HV) as much as 35,85 liters, and motorcycles (MC) as much as 203,24 liters.  Loss of fuel use due to queues caused by opening and closing roads on Jalan. Bts. Lhokseumawe City/North Aceh – Lhoksukon Km. 280 for 6 hours (12.00 – 18.00 WIB) on weekdays is 4.402.185,00 and on holidays it is Rp. 5.541.065,00.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信