大型机器定子绕组寿命评估案例研究,可作为预测性维护计划的关键和有效工具

C. Pinto, Robert N.Strickler, Vijay Anand
{"title":"大型机器定子绕组寿命评估案例研究,可作为预测性维护计划的关键和有效工具","authors":"C. Pinto, Robert N.Strickler, Vijay Anand","doi":"10.1109/PCIC42668.2022.10181280","DOIUrl":null,"url":null,"abstract":"The cost of an unexpected plant shutdown due to failure of critical equipment such as a large motor in the Chemical Oil and Gas process industry could have a significant impact on earnings. Failure surveys of motors in petrochemical plants have indicated that in motors rated over 2000 kW over 60% of all failures are attributed to stator windings. Additionally, the downtime involved in repairing or rewinding a stator could be considerable. Condition assessment and life time estimation techniques of stator winding could be very beneficial to determine the anticipated rate of degradation and estimate the existing and expected reliability till the next outage. A clear plan then could be devised for administering the necessary machine maintenance. This paper explains how such an approach helped to make the right maintenance and budget decisions and to minimize the risk of unplanned shutdown a 17,433 HP (13000kW) synchronous motor. This motor, which drives a compressor that’s critical to production, has been in operation since 2003 and has no spare. By adding the routine inspection of the stator winding to condition assessment and lifetime estimation techniques that estimate the amount of life consumed and the anticipated rate of degradation, this team has increased optimal asset reliablity and machine life","PeriodicalId":301848,"journal":{"name":"2022 IEEE IAS Petroleum and Chemical Industry Technical Conference (PCIC)","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Case Study on Lifetime Assessment of Stator Windings in Large Machines that can be a Critical and Effective Tool in a Predictive Maintenance Plan\",\"authors\":\"C. Pinto, Robert N.Strickler, Vijay Anand\",\"doi\":\"10.1109/PCIC42668.2022.10181280\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The cost of an unexpected plant shutdown due to failure of critical equipment such as a large motor in the Chemical Oil and Gas process industry could have a significant impact on earnings. Failure surveys of motors in petrochemical plants have indicated that in motors rated over 2000 kW over 60% of all failures are attributed to stator windings. Additionally, the downtime involved in repairing or rewinding a stator could be considerable. Condition assessment and life time estimation techniques of stator winding could be very beneficial to determine the anticipated rate of degradation and estimate the existing and expected reliability till the next outage. A clear plan then could be devised for administering the necessary machine maintenance. This paper explains how such an approach helped to make the right maintenance and budget decisions and to minimize the risk of unplanned shutdown a 17,433 HP (13000kW) synchronous motor. This motor, which drives a compressor that’s critical to production, has been in operation since 2003 and has no spare. By adding the routine inspection of the stator winding to condition assessment and lifetime estimation techniques that estimate the amount of life consumed and the anticipated rate of degradation, this team has increased optimal asset reliablity and machine life\",\"PeriodicalId\":301848,\"journal\":{\"name\":\"2022 IEEE IAS Petroleum and Chemical Industry Technical Conference (PCIC)\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 IEEE IAS Petroleum and Chemical Industry Technical Conference (PCIC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCIC42668.2022.10181280\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE IAS Petroleum and Chemical Industry Technical Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCIC42668.2022.10181280","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在化工油气加工行业,由于关键设备(如大型电机)故障而导致工厂意外停工的成本可能会对收益产生重大影响。对石油化工厂电机的故障调查表明,在额定功率超过2000千瓦的电机中,超过60%的故障是由于定子绕组。此外,修理或重绕定子所需的停机时间可能相当长。定子绕组的状态评估和寿命估计技术对于确定定子绕组的预期退化率和估计定子绕组在下一次停机前的现有和预期可靠性是非常有益的。这样就可以制定一个明确的计划来管理必要的机器维护。本文解释了这种方法如何帮助做出正确的维护和预算决策,并将17433 HP (13000kW)同步电机意外停机的风险降至最低。该电机用于驱动对生产至关重要的压缩机,自2003年以来一直在运行,并且没有备用电机。通过将定子绕组的例行检查添加到状态评估和寿命估计技术中,以估计消耗的寿命和预期的退化率,该团队提高了最佳资产可靠性和机器寿命
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Case Study on Lifetime Assessment of Stator Windings in Large Machines that can be a Critical and Effective Tool in a Predictive Maintenance Plan
The cost of an unexpected plant shutdown due to failure of critical equipment such as a large motor in the Chemical Oil and Gas process industry could have a significant impact on earnings. Failure surveys of motors in petrochemical plants have indicated that in motors rated over 2000 kW over 60% of all failures are attributed to stator windings. Additionally, the downtime involved in repairing or rewinding a stator could be considerable. Condition assessment and life time estimation techniques of stator winding could be very beneficial to determine the anticipated rate of degradation and estimate the existing and expected reliability till the next outage. A clear plan then could be devised for administering the necessary machine maintenance. This paper explains how such an approach helped to make the right maintenance and budget decisions and to minimize the risk of unplanned shutdown a 17,433 HP (13000kW) synchronous motor. This motor, which drives a compressor that’s critical to production, has been in operation since 2003 and has no spare. By adding the routine inspection of the stator winding to condition assessment and lifetime estimation techniques that estimate the amount of life consumed and the anticipated rate of degradation, this team has increased optimal asset reliablity and machine life
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信