Muhamad Izzatur Rahman, Nurrahman As’ad, Eri Achiraeniwati
{"title":"根据简历中牛仔裤制作过程的原始时间来确定操作员的数量。X","authors":"Muhamad Izzatur Rahman, Nurrahman As’ad, Eri Achiraeniwati","doi":"10.29313/bcsies.v3i1.6119","DOIUrl":null,"url":null,"abstract":"Abstract. CV. X is a company that produces jeans. The problem faced by the company is the non-achievement of the product as much as 22% of the target set at 100 pcs of jeans per week including overtime. The operator carries out production activities from the beginning (processing) to the end (finishing) totaling 2 workers. This is due to the limited number of existing operators and the difference in the production process time carried out by the operator. The difference in product completion time is due to the fact that the company does not have a standard time for the production process as well as limited facilities for the company. The purpose of this study is to measure the standard time to become a standard for operators and the company's basis in determining the target and the number of operators needed in the production process. The methods used in this study are measurement of standard time with downtime, calculation of workload and operator needs using Work Load Analysis (WLA). The standard time for producing jeans on operator 1 for 87.07 minutes and operator 2 for 93.13 minutes. WLA values were obtained values of 1.51 (151%) for operator 1 and 1.62 (162%) for operator 2 indicating that the workload received by the operator >100% or overloaded, the result indicates that it is necessary to add an operator. The results of the calculation of additional operators required as many as 1 person by utilizing packaging part operators and adding work facilities in the form of 1 cutting machine, a single needle sewing machine, and an overlock machine. The load obtained after the proposal decreased by close to 100% and the achievement of the target was above 100 pcs per week. \nKeywords: Workload, Standard Time, Number of Operators Required, Work Load Analysis. \nAbstrak. CV. X merupakan perusahaan yang memproduksi celana jeans. Permasalahan yang dihadapi perusahaan yaitu ketidaktercapaian produk sebanyak 22% dari target yang ditetapkan sebanyak 100 pcs celana perminggu termasuk dengan overtime. Operator melakukan kegiatan produksi dari awal (pemolaan) sampai akhir (finishing) berjumlah 2 orang tenaga kerja. Hal ini disebabkan terbatasnya jumlah operator yang ada serta perbedaan waktu proses produksi yang dilakukan operator. Perbedaan waktu penyelesaian produk disebabkan karena perusahaan tidak memiliki waktu standar untuk proses produksi serta keterbatasan fasilitas pada perusahaan. Tujuan penelitian ini yaitu mengukur waktu baku untuk menjadi standar bagi operator dan dasar perusahaan dalam menentukan target serta jumlah operator yang dibutuhkan dalam proses produksi. Metode yang digunakan pada penelitian ini yaitu pengukuran waktu baku dengan jam henti, perhitungan beban kerja dan kebutuhan operator menggunakan Work Load Analysis (WLA). Waktu baku untuk memproduksi celana jeans pada operator 1 selama 87,07 menit dan operator 2 selama 93,13 menit. Nilai WLA didapatkan nilai 1,51 (151%) untuk operator 1 dan 1,62 (162%) untuk operator 2 yang menunjukkan bahwa beban kerja yang diterima operator >100% atau overload, hasil tersebut menunjukkan bahwa perlu dilakukannya penambahan operator. Hasil perhitungan tambahan operator yang diperlukan sebanyak 1 orang dengan memanfaatkan operator bagian pengemasan serta penambahan fasilitas kerja berupa 1 mesin potong, mesin jahit single needle, dan mesin obras. Beban yang didapat setelah usulan menurun mendekati 100% dan ketercapaian target sudah diatas 100 pcs perminggu. \nKata Kunci: Beban Kerja, Waktu Baku, Kebutuhan Jumlah Operator, Work Load Analysis.","PeriodicalId":127015,"journal":{"name":"Bandung Conference Series: Industrial Engineering Science","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Penentuan Jumlah Operator Berdasarkan Waktu Baku pada Proses Produksi Celana Jeans di CV. X\",\"authors\":\"Muhamad Izzatur Rahman, Nurrahman As’ad, Eri Achiraeniwati\",\"doi\":\"10.29313/bcsies.v3i1.6119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract. CV. X is a company that produces jeans. The problem faced by the company is the non-achievement of the product as much as 22% of the target set at 100 pcs of jeans per week including overtime. The operator carries out production activities from the beginning (processing) to the end (finishing) totaling 2 workers. This is due to the limited number of existing operators and the difference in the production process time carried out by the operator. The difference in product completion time is due to the fact that the company does not have a standard time for the production process as well as limited facilities for the company. The purpose of this study is to measure the standard time to become a standard for operators and the company's basis in determining the target and the number of operators needed in the production process. The methods used in this study are measurement of standard time with downtime, calculation of workload and operator needs using Work Load Analysis (WLA). The standard time for producing jeans on operator 1 for 87.07 minutes and operator 2 for 93.13 minutes. WLA values were obtained values of 1.51 (151%) for operator 1 and 1.62 (162%) for operator 2 indicating that the workload received by the operator >100% or overloaded, the result indicates that it is necessary to add an operator. The results of the calculation of additional operators required as many as 1 person by utilizing packaging part operators and adding work facilities in the form of 1 cutting machine, a single needle sewing machine, and an overlock machine. The load obtained after the proposal decreased by close to 100% and the achievement of the target was above 100 pcs per week. \\nKeywords: Workload, Standard Time, Number of Operators Required, Work Load Analysis. \\nAbstrak. CV. X merupakan perusahaan yang memproduksi celana jeans. Permasalahan yang dihadapi perusahaan yaitu ketidaktercapaian produk sebanyak 22% dari target yang ditetapkan sebanyak 100 pcs celana perminggu termasuk dengan overtime. Operator melakukan kegiatan produksi dari awal (pemolaan) sampai akhir (finishing) berjumlah 2 orang tenaga kerja. Hal ini disebabkan terbatasnya jumlah operator yang ada serta perbedaan waktu proses produksi yang dilakukan operator. Perbedaan waktu penyelesaian produk disebabkan karena perusahaan tidak memiliki waktu standar untuk proses produksi serta keterbatasan fasilitas pada perusahaan. Tujuan penelitian ini yaitu mengukur waktu baku untuk menjadi standar bagi operator dan dasar perusahaan dalam menentukan target serta jumlah operator yang dibutuhkan dalam proses produksi. Metode yang digunakan pada penelitian ini yaitu pengukuran waktu baku dengan jam henti, perhitungan beban kerja dan kebutuhan operator menggunakan Work Load Analysis (WLA). Waktu baku untuk memproduksi celana jeans pada operator 1 selama 87,07 menit dan operator 2 selama 93,13 menit. Nilai WLA didapatkan nilai 1,51 (151%) untuk operator 1 dan 1,62 (162%) untuk operator 2 yang menunjukkan bahwa beban kerja yang diterima operator >100% atau overload, hasil tersebut menunjukkan bahwa perlu dilakukannya penambahan operator. Hasil perhitungan tambahan operator yang diperlukan sebanyak 1 orang dengan memanfaatkan operator bagian pengemasan serta penambahan fasilitas kerja berupa 1 mesin potong, mesin jahit single needle, dan mesin obras. Beban yang didapat setelah usulan menurun mendekati 100% dan ketercapaian target sudah diatas 100 pcs perminggu. \\nKata Kunci: Beban Kerja, Waktu Baku, Kebutuhan Jumlah Operator, Work Load Analysis.\",\"PeriodicalId\":127015,\"journal\":{\"name\":\"Bandung Conference Series: Industrial Engineering Science\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bandung Conference Series: Industrial Engineering Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29313/bcsies.v3i1.6119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Industrial Engineering Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsies.v3i1.6119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要简历。X是一家生产牛仔裤的公司。该公司面临的问题是,包括加班在内,每周生产100件牛仔裤的目标有22%没有完成。操作人员从开始(加工)到结束(精加工)进行生产活动,总共2名工人。这是由于现有作业人员数量有限,以及作业人员所执行的生产过程时间存在差异。产品完成时间的差异是由于公司没有生产过程的标准时间以及公司有限的设施。本研究的目的是测量标准时间,使其成为作业人员的标准和公司确定生产过程中所需作业人员的目标和数量的依据。本研究中使用的方法是测量标准停机时间,使用工作量分析(WLA)计算工作量和操作员需求。工序1生产牛仔裤的标准时间为87.07分钟,工序2生产牛仔裤的标准时间为93.13分钟。操作员1的WLA值为1.51(151%),操作员2的WLA值为1.62(162%),表明操作员>接收的工作量为100%或过载,结果表明有必要增加操作员。计算结果表明,利用包装部分操作人员,加上1台裁切机、1台单针缝纫机、1台包封机等工作设备,需要的额外操作人员多达1人。建议后获得的负载减少了近100%,每周达到100台以上的目标。关键词:工作量,标准时间,所需操作人数,工作量分析。Abstrak。简历。X merupakan perushaan yang memproduksi celana牛仔裤。Permasalahan yang dihadapi perusahan yitu ketidaktercapapak产品sebanyak 22% dari目标yang ditetapkan sebanyak 100 pcs celana perminggu termasukdengan加班。操作员melakukan kegiatan produksi dari awal (pemolaan) sampai akhir(整理)berjumlah 2 orang tenaga kerja。Hal ini disebabkan terbatasnya jumlah操作员yang ada serta perbedaan waktu加工产品yang dilakukan操作员。Perbedaan waktu penyelesan产品disebabkan karena perushaan和tidak memiliki waktu标准untuk加工产品serta keterbatan和fasilitas padushaan。Tujuan penelitian ini yitu mengukur waktu baku untuk menjadi标准bagi操作员dandasar perusahaan dalam menentukan目标serta jumlah操作员yang dibutuhkan dalam加工产品。Metode yang digunakan pada penelitian ini yitu penguin baku dengan jam heni, perhitungan beban kerja dan kebutuhan操作员menggunakan工作负荷分析(WLA)。Waktu baku untuk memproduksi celana jeans牛仔裤操作员1 selama 87,07 menit和操作员2 selama 93,13 menit。Nilai WLA didapatkan Nilai 1,51 (151%) untuk operator 1 dan 1,62 (162%) untuk operator 2 yang menunjukkan bahwa beban kerja yang diterima operator >100% atau overload, hasil tersebut menunjukkan bahwa perlu dilakukannya penambahan operator。Hasil perhitungan tambahan操作员yang diperlukan sebanyak 1 orang dengan memanfaatkan操作员bagian pengemasan serta penambahan fasilitas kerja berupa 1 mesin poong, mesin jahit单针,dan mesin obras。Beban yang表示:“我的目标是100个数据。”Kata Kunci: Beban Kerja, Waktu Baku, Kebutuhan Jumlah操作员,工作量分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Penentuan Jumlah Operator Berdasarkan Waktu Baku pada Proses Produksi Celana Jeans di CV. X
Abstract. CV. X is a company that produces jeans. The problem faced by the company is the non-achievement of the product as much as 22% of the target set at 100 pcs of jeans per week including overtime. The operator carries out production activities from the beginning (processing) to the end (finishing) totaling 2 workers. This is due to the limited number of existing operators and the difference in the production process time carried out by the operator. The difference in product completion time is due to the fact that the company does not have a standard time for the production process as well as limited facilities for the company. The purpose of this study is to measure the standard time to become a standard for operators and the company's basis in determining the target and the number of operators needed in the production process. The methods used in this study are measurement of standard time with downtime, calculation of workload and operator needs using Work Load Analysis (WLA). The standard time for producing jeans on operator 1 for 87.07 minutes and operator 2 for 93.13 minutes. WLA values were obtained values of 1.51 (151%) for operator 1 and 1.62 (162%) for operator 2 indicating that the workload received by the operator >100% or overloaded, the result indicates that it is necessary to add an operator. The results of the calculation of additional operators required as many as 1 person by utilizing packaging part operators and adding work facilities in the form of 1 cutting machine, a single needle sewing machine, and an overlock machine. The load obtained after the proposal decreased by close to 100% and the achievement of the target was above 100 pcs per week. Keywords: Workload, Standard Time, Number of Operators Required, Work Load Analysis. Abstrak. CV. X merupakan perusahaan yang memproduksi celana jeans. Permasalahan yang dihadapi perusahaan yaitu ketidaktercapaian produk sebanyak 22% dari target yang ditetapkan sebanyak 100 pcs celana perminggu termasuk dengan overtime. Operator melakukan kegiatan produksi dari awal (pemolaan) sampai akhir (finishing) berjumlah 2 orang tenaga kerja. Hal ini disebabkan terbatasnya jumlah operator yang ada serta perbedaan waktu proses produksi yang dilakukan operator. Perbedaan waktu penyelesaian produk disebabkan karena perusahaan tidak memiliki waktu standar untuk proses produksi serta keterbatasan fasilitas pada perusahaan. Tujuan penelitian ini yaitu mengukur waktu baku untuk menjadi standar bagi operator dan dasar perusahaan dalam menentukan target serta jumlah operator yang dibutuhkan dalam proses produksi. Metode yang digunakan pada penelitian ini yaitu pengukuran waktu baku dengan jam henti, perhitungan beban kerja dan kebutuhan operator menggunakan Work Load Analysis (WLA). Waktu baku untuk memproduksi celana jeans pada operator 1 selama 87,07 menit dan operator 2 selama 93,13 menit. Nilai WLA didapatkan nilai 1,51 (151%) untuk operator 1 dan 1,62 (162%) untuk operator 2 yang menunjukkan bahwa beban kerja yang diterima operator >100% atau overload, hasil tersebut menunjukkan bahwa perlu dilakukannya penambahan operator. Hasil perhitungan tambahan operator yang diperlukan sebanyak 1 orang dengan memanfaatkan operator bagian pengemasan serta penambahan fasilitas kerja berupa 1 mesin potong, mesin jahit single needle, dan mesin obras. Beban yang didapat setelah usulan menurun mendekati 100% dan ketercapaian target sudah diatas 100 pcs perminggu. Kata Kunci: Beban Kerja, Waktu Baku, Kebutuhan Jumlah Operator, Work Load Analysis.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信