{"title":"印度高层住宅项目成本超支因素研究","authors":"Saket Patni, Venkata Krishna Kumar Sadhu","doi":"10.51983/tarce-2023.12.1.3666","DOIUrl":null,"url":null,"abstract":"Cost overruns in building projects are typical in India. This might occur owing to a variety of factors. The aim of the study was to identify the factors impacting high-rise housing project costs in India, that are likely regulatable by head contractors. A questionnaire survey was used to perform this study with a group of related professionals from firms in the private as well as public sectors, having experience in high-rise housing projects. The frequency and impact of each factor were assessed based on the perspectives of the participants. The factors were then rated in order of the increasing Index of Relative Importance. The study identified significant factors that are likely to be regulated by head contractors, namely, productivity of labor, the performance of suppliers and sub-contractors, productivity of equipment, poor management of the site, scheduling, controlling and monitoring, inexperienced project managers, ineffective procurement planning of materials, ineffective procurement of equipment, delivery of materials (shortage or delay) and shortage of skilled labor.","PeriodicalId":437898,"journal":{"name":"The Asian Review of Civil Engineering","volume":"126 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigating Cost Overrun Factors in High-Rise Housing Projects in India\",\"authors\":\"Saket Patni, Venkata Krishna Kumar Sadhu\",\"doi\":\"10.51983/tarce-2023.12.1.3666\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Cost overruns in building projects are typical in India. This might occur owing to a variety of factors. The aim of the study was to identify the factors impacting high-rise housing project costs in India, that are likely regulatable by head contractors. A questionnaire survey was used to perform this study with a group of related professionals from firms in the private as well as public sectors, having experience in high-rise housing projects. The frequency and impact of each factor were assessed based on the perspectives of the participants. The factors were then rated in order of the increasing Index of Relative Importance. The study identified significant factors that are likely to be regulated by head contractors, namely, productivity of labor, the performance of suppliers and sub-contractors, productivity of equipment, poor management of the site, scheduling, controlling and monitoring, inexperienced project managers, ineffective procurement planning of materials, ineffective procurement of equipment, delivery of materials (shortage or delay) and shortage of skilled labor.\",\"PeriodicalId\":437898,\"journal\":{\"name\":\"The Asian Review of Civil Engineering\",\"volume\":\"126 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Asian Review of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.51983/tarce-2023.12.1.3666\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Asian Review of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51983/tarce-2023.12.1.3666","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在印度,建筑项目的成本超支是很典型的。这可能是由于多种因素造成的。这项研究的目的是确定影响印度高层住宅项目成本的因素,这些因素可能由总承包商监管。本研究采用问卷调查的方式对来自私营和公共部门的相关专业人员进行了调查,这些专业人员都有高层住宅项目的经验。每个因素的频率和影响是基于参与者的观点来评估的。然后按相对重要性指数的递增顺序对这些因素进行评级。研究确定了可能由总承包商管制的重要因素,即劳动生产率、供应商和分包商的业绩、设备生产率、现场管理不善、调度、控制和监测、缺乏经验的项目经理、材料采购规划无效、设备采购无效、材料交付(短缺或延误)和熟练劳动力短缺。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigating Cost Overrun Factors in High-Rise Housing Projects in India
Cost overruns in building projects are typical in India. This might occur owing to a variety of factors. The aim of the study was to identify the factors impacting high-rise housing project costs in India, that are likely regulatable by head contractors. A questionnaire survey was used to perform this study with a group of related professionals from firms in the private as well as public sectors, having experience in high-rise housing projects. The frequency and impact of each factor were assessed based on the perspectives of the participants. The factors were then rated in order of the increasing Index of Relative Importance. The study identified significant factors that are likely to be regulated by head contractors, namely, productivity of labor, the performance of suppliers and sub-contractors, productivity of equipment, poor management of the site, scheduling, controlling and monitoring, inexperienced project managers, ineffective procurement planning of materials, ineffective procurement of equipment, delivery of materials (shortage or delay) and shortage of skilled labor.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信