{"title":"基于BIM的建筑CPTED应用的法律制度分析及研究趋势","authors":"Go-won Kim, Seok-jin Kang","doi":"10.26470/jcssed.2022.13.3.33","DOIUrl":null,"url":null,"abstract":"It is most effective to apply CPTED in the architectural design stage. On the other hand, the use of BIM is increasing in the construction field. BIM is used for information linkage and performance analysis simulation by building life-cycle. In particular, BIM-based legality review can be conducted at Construction Consult. In line with these changes in the architectural field, it is necessary to conduct research to use BIM in the CPTED field. It will be possible to supplement various limitations that have appeared in the application of CPTED for each building life-cycle stage. Therefore, in this study, the legal system for applying BIM and CPTED in the Construction Consent stage is considered. Next, this study examines BIM-related studies that appeared in 1) the architectural design stage, 2) the architectural construction consultation stage, and 3) the CPTED design certification stage. The purpose of this is to derive future research directions.","PeriodicalId":213826,"journal":{"name":"Korea CPTED Association","volume":"148 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Legal System and Research Trends for Application of CPTED in Building Based on BIM\",\"authors\":\"Go-won Kim, Seok-jin Kang\",\"doi\":\"10.26470/jcssed.2022.13.3.33\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"It is most effective to apply CPTED in the architectural design stage. On the other hand, the use of BIM is increasing in the construction field. BIM is used for information linkage and performance analysis simulation by building life-cycle. In particular, BIM-based legality review can be conducted at Construction Consult. In line with these changes in the architectural field, it is necessary to conduct research to use BIM in the CPTED field. It will be possible to supplement various limitations that have appeared in the application of CPTED for each building life-cycle stage. Therefore, in this study, the legal system for applying BIM and CPTED in the Construction Consent stage is considered. Next, this study examines BIM-related studies that appeared in 1) the architectural design stage, 2) the architectural construction consultation stage, and 3) the CPTED design certification stage. The purpose of this is to derive future research directions.\",\"PeriodicalId\":213826,\"journal\":{\"name\":\"Korea CPTED Association\",\"volume\":\"148 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korea CPTED Association\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26470/jcssed.2022.13.3.33\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korea CPTED Association","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26470/jcssed.2022.13.3.33","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Analysis of Legal System and Research Trends for Application of CPTED in Building Based on BIM
It is most effective to apply CPTED in the architectural design stage. On the other hand, the use of BIM is increasing in the construction field. BIM is used for information linkage and performance analysis simulation by building life-cycle. In particular, BIM-based legality review can be conducted at Construction Consult. In line with these changes in the architectural field, it is necessary to conduct research to use BIM in the CPTED field. It will be possible to supplement various limitations that have appeared in the application of CPTED for each building life-cycle stage. Therefore, in this study, the legal system for applying BIM and CPTED in the Construction Consent stage is considered. Next, this study examines BIM-related studies that appeared in 1) the architectural design stage, 2) the architectural construction consultation stage, and 3) the CPTED design certification stage. The purpose of this is to derive future research directions.