{"title":"与火灾信号系统集成的固定气体灭火设备的可靠性-运行分析","authors":"T. Klimczak, J. Paś","doi":"10.5604/01.3001.0013.3011","DOIUrl":null,"url":null,"abstract":"Fire protection of server rooms and data processing centres, located in public buildings, uses fire extinguishing equipment known as fixed gas fire extinguishing devices (SUG-G). The extinguishing medium (gas in tanks) should be stored at a location indicated in the fire scenario and in the technical contractor project for SUG-G. SUG-G is intended to extinguish a fire in its initial stages and to prevent fire spreading. The fire signalling central station (CSP) receives a fire signal from a group of sensors located in the protected premise and notifies the Fire Brigade (PS), whilst the fire extinguishing control room automatically starts the gas extinguishing process. Such use of a signalling and extinguishing system results in a redundant system. This improves reliability of the fire signalling system (SSP), which is responsible for safety inside the building.\nKeywords: sensor, operation, fire signalling systems.\n\n","PeriodicalId":232579,"journal":{"name":"Bulletin of the Military University of Technology","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Reliability-operational analysis of fixed gas fire extinguishing equipment integrated with fire signalling systems\",\"authors\":\"T. Klimczak, J. Paś\",\"doi\":\"10.5604/01.3001.0013.3011\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Fire protection of server rooms and data processing centres, located in public buildings, uses fire extinguishing equipment known as fixed gas fire extinguishing devices (SUG-G). The extinguishing medium (gas in tanks) should be stored at a location indicated in the fire scenario and in the technical contractor project for SUG-G. SUG-G is intended to extinguish a fire in its initial stages and to prevent fire spreading. The fire signalling central station (CSP) receives a fire signal from a group of sensors located in the protected premise and notifies the Fire Brigade (PS), whilst the fire extinguishing control room automatically starts the gas extinguishing process. Such use of a signalling and extinguishing system results in a redundant system. This improves reliability of the fire signalling system (SSP), which is responsible for safety inside the building.\\nKeywords: sensor, operation, fire signalling systems.\\n\\n\",\"PeriodicalId\":232579,\"journal\":{\"name\":\"Bulletin of the Military University of Technology\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Bulletin of the Military University of Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5604/01.3001.0013.3011\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of the Military University of Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5604/01.3001.0013.3011","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Reliability-operational analysis of fixed gas fire extinguishing equipment integrated with fire signalling systems
Fire protection of server rooms and data processing centres, located in public buildings, uses fire extinguishing equipment known as fixed gas fire extinguishing devices (SUG-G). The extinguishing medium (gas in tanks) should be stored at a location indicated in the fire scenario and in the technical contractor project for SUG-G. SUG-G is intended to extinguish a fire in its initial stages and to prevent fire spreading. The fire signalling central station (CSP) receives a fire signal from a group of sensors located in the protected premise and notifies the Fire Brigade (PS), whilst the fire extinguishing control room automatically starts the gas extinguishing process. Such use of a signalling and extinguishing system results in a redundant system. This improves reliability of the fire signalling system (SSP), which is responsible for safety inside the building.
Keywords: sensor, operation, fire signalling systems.