M. Latkova, P. Braciník, M. Baherník, Sandra Krollová
{"title":"基于可再生能源与ENSTO-E电网规范要求的智能电网频率控制","authors":"M. Latkova, P. Braciník, M. Baherník, Sandra Krollová","doi":"10.1109/ELEKTRO.2016.7512092","DOIUrl":null,"url":null,"abstract":"The paper presents the operation and frequency control in the Smart Grid region during overfrequency. The studied region consists of a PV power plant, a conventional source represented by a small synchronous generator with the speed controller and a load. The frequency control defined by the recent ENTSO-E Grid Code for generating units of type B is applied on the PV power plant operation and the influence of such control on frequency changes is studied. Obtained simulation results are used to outline a possible solution for future Smart Grid regions' frequency control.","PeriodicalId":369251,"journal":{"name":"2016 ELEKTRO","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Frequency control in smart grids based on renewables vs. ENSTO-E grid code requirements\",\"authors\":\"M. Latkova, P. Braciník, M. Baherník, Sandra Krollová\",\"doi\":\"10.1109/ELEKTRO.2016.7512092\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents the operation and frequency control in the Smart Grid region during overfrequency. The studied region consists of a PV power plant, a conventional source represented by a small synchronous generator with the speed controller and a load. The frequency control defined by the recent ENTSO-E Grid Code for generating units of type B is applied on the PV power plant operation and the influence of such control on frequency changes is studied. Obtained simulation results are used to outline a possible solution for future Smart Grid regions' frequency control.\",\"PeriodicalId\":369251,\"journal\":{\"name\":\"2016 ELEKTRO\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 ELEKTRO\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ELEKTRO.2016.7512092\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 ELEKTRO","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELEKTRO.2016.7512092","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Frequency control in smart grids based on renewables vs. ENSTO-E grid code requirements
The paper presents the operation and frequency control in the Smart Grid region during overfrequency. The studied region consists of a PV power plant, a conventional source represented by a small synchronous generator with the speed controller and a load. The frequency control defined by the recent ENTSO-E Grid Code for generating units of type B is applied on the PV power plant operation and the influence of such control on frequency changes is studied. Obtained simulation results are used to outline a possible solution for future Smart Grid regions' frequency control.