Mingxing Yuan, Xiaosong Li, Yujiao Jiang, Zenghua Li
{"title":"基于BP神经网络的数据驱动设备采购合同管理评估设计研究","authors":"Mingxing Yuan, Xiaosong Li, Yujiao Jiang, Zenghua Li","doi":"10.1109/ICMSSE53595.2021.00063","DOIUrl":null,"url":null,"abstract":"Equipment procurement contract management evaluation is an important way to effectively monitor and reasonably judge the process of equipment procurement contract management. This paper uses the concept of “data-driven + evaluation research” to carry out the overall design of equipment procurement contract management evaluation, uses comprehensive integration method to build the evaluation system composed of seven elements, uses flow chart and problem feedback mechanism to construct the evaluation process, and uses the BP neural network method to construct and verify the evaluation model based on data. It provides theoretical and practical reference for the systematic development of equipment procurement contract management evaluation.","PeriodicalId":331570,"journal":{"name":"2021 International Conference on Management Science and Software Engineering (ICMSSE)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Design of Data-driven Equipment Procurement Contract Management Evaluation Based on the BP Neural Network Method\",\"authors\":\"Mingxing Yuan, Xiaosong Li, Yujiao Jiang, Zenghua Li\",\"doi\":\"10.1109/ICMSSE53595.2021.00063\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Equipment procurement contract management evaluation is an important way to effectively monitor and reasonably judge the process of equipment procurement contract management. This paper uses the concept of “data-driven + evaluation research” to carry out the overall design of equipment procurement contract management evaluation, uses comprehensive integration method to build the evaluation system composed of seven elements, uses flow chart and problem feedback mechanism to construct the evaluation process, and uses the BP neural network method to construct and verify the evaluation model based on data. It provides theoretical and practical reference for the systematic development of equipment procurement contract management evaluation.\",\"PeriodicalId\":331570,\"journal\":{\"name\":\"2021 International Conference on Management Science and Software Engineering (ICMSSE)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference on Management Science and Software Engineering (ICMSSE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICMSSE53595.2021.00063\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Management Science and Software Engineering (ICMSSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMSSE53595.2021.00063","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Research on Design of Data-driven Equipment Procurement Contract Management Evaluation Based on the BP Neural Network Method
Equipment procurement contract management evaluation is an important way to effectively monitor and reasonably judge the process of equipment procurement contract management. This paper uses the concept of “data-driven + evaluation research” to carry out the overall design of equipment procurement contract management evaluation, uses comprehensive integration method to build the evaluation system composed of seven elements, uses flow chart and problem feedback mechanism to construct the evaluation process, and uses the BP neural network method to construct and verify the evaluation model based on data. It provides theoretical and practical reference for the systematic development of equipment procurement contract management evaluation.