{"title":"Tevatron的快速注入启动系统","authors":"C. Jensen, R. Reilly, Fermilab B. Hanna","doi":"10.1109/PAC.2001.988232","DOIUrl":null,"url":null,"abstract":"A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system was designed to be upgraded to 132 ns bunch spacing with additional pulse supplies. The system design tradeoffs needed to meet these goals will be discussed. These include the system topology, the system impedance and the number of magnets. This system has been installed in the Tevatron.","PeriodicalId":313758,"journal":{"name":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-07-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"A fast injection kicker system for the Tevatron\",\"authors\":\"C. Jensen, R. Reilly, Fermilab B. Hanna\",\"doi\":\"10.1109/PAC.2001.988232\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system was designed to be upgraded to 132 ns bunch spacing with additional pulse supplies. The system design tradeoffs needed to meet these goals will be discussed. These include the system topology, the system impedance and the number of magnets. This system has been installed in the Tevatron.\",\"PeriodicalId\":313758,\"journal\":{\"name\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-07-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PAC.2001.988232\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAC.2001.988232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2
摘要
在Run II时代,Tevatron需要一种新的质子注入增压系统。新系统的设计目标是将1.25 kG-m送入垂直48 mm /spl次/水平71 mm /spl次/ 5米长的磁孔中,束束间距为396 ns。该系统被设计为升级到132 ns束间距,并增加了脉冲电源。我们将讨论满足这些目标所需的系统设计权衡。这些包括系统拓扑,系统阻抗和磁体的数量。该系统已安装在Tevatron中。
A new proton injection kicker system is required for the Tevatron in the Run II era. The new system was designed to supply 1.25 kG-m into a magnetic aperture of 48 mm vertical /spl times/ 71 mm horizontal /spl times/ 5 m long with a 396 ns bunch spacing. The system was designed to be upgraded to 132 ns bunch spacing with additional pulse supplies. The system design tradeoffs needed to meet these goals will be discussed. These include the system topology, the system impedance and the number of magnets. This system has been installed in the Tevatron.