{"title":"巴西新法规框架下火电厂项目的选址与经济风险","authors":"D. Ramos, E. Fadigas, W. S. Lima","doi":"10.1109/ICPST.2000.897137","DOIUrl":null,"url":null,"abstract":"This paper presents a study making an analysis of thermal plant implantation into the Brazilian South/Southeast/West interconnected power systems. Thus, an evaluation is given of the influence of some local parameters, in order to evaluate the best site for building the thermal power station. In addition to the site selection considerations, an economic risks analysis in the new scenario of the Brazilian electrical energy trading activity is carried out.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Site selection and economic risks for thermal power plant projects under the new Brazilian regulatory framework\",\"authors\":\"D. Ramos, E. Fadigas, W. S. Lima\",\"doi\":\"10.1109/ICPST.2000.897137\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents a study making an analysis of thermal plant implantation into the Brazilian South/Southeast/West interconnected power systems. Thus, an evaluation is given of the influence of some local parameters, in order to evaluate the best site for building the thermal power station. In addition to the site selection considerations, an economic risks analysis in the new scenario of the Brazilian electrical energy trading activity is carried out.\",\"PeriodicalId\":330989,\"journal\":{\"name\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2000.897137\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.897137","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Site selection and economic risks for thermal power plant projects under the new Brazilian regulatory framework
This paper presents a study making an analysis of thermal plant implantation into the Brazilian South/Southeast/West interconnected power systems. Thus, an evaluation is given of the influence of some local parameters, in order to evaluate the best site for building the thermal power station. In addition to the site selection considerations, an economic risks analysis in the new scenario of the Brazilian electrical energy trading activity is carried out.