{"title":"在苏腊巴亚利登酒店的机械和电气实施及时","authors":"F. Nuciferani, D. Listyaningsih, M. F. Aulady, M. Santoso","doi":"10.31284/j.jasmet.2022.v3i2.3045","DOIUrl":null,"url":null,"abstract":"Mechanical electrical and plumbing (MEP) job is a job in construction project and the implementation is conducted after the workers conduct structural work. The use of materials has an important part from project total cost because waste will be happened if it is used uncontrollable. The aim of this study was identifying JIT application to electrical work in Leedon Hotel Surabaya. The condition before the researcher implemented JIT in Leedon Hotel project, it was identified waste caused by design change, lack of coordination between project and Head Office, and materials availability with excess material stocks. The limited size of the warehouse as MEP materials storage made the material storage not optimal and it had potential to be waste. Applying just in time concept had a focus on waste elimination by planning - needs - use in the field based on the application of JIT method in the Leedon Hotel project. Limited warehouse conditions could still carry out material control without using excess material inventory which had an impact on minimizing the emergence of waste.","PeriodicalId":426640,"journal":{"name":"Journal of Applied Sciences, Management and Engineering Technology","volume":"102 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Just in Time on Mechanical and Electrical Implementation in Leedon Hotel Surabaya\",\"authors\":\"F. Nuciferani, D. Listyaningsih, M. F. Aulady, M. Santoso\",\"doi\":\"10.31284/j.jasmet.2022.v3i2.3045\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Mechanical electrical and plumbing (MEP) job is a job in construction project and the implementation is conducted after the workers conduct structural work. The use of materials has an important part from project total cost because waste will be happened if it is used uncontrollable. The aim of this study was identifying JIT application to electrical work in Leedon Hotel Surabaya. The condition before the researcher implemented JIT in Leedon Hotel project, it was identified waste caused by design change, lack of coordination between project and Head Office, and materials availability with excess material stocks. The limited size of the warehouse as MEP materials storage made the material storage not optimal and it had potential to be waste. Applying just in time concept had a focus on waste elimination by planning - needs - use in the field based on the application of JIT method in the Leedon Hotel project. Limited warehouse conditions could still carry out material control without using excess material inventory which had an impact on minimizing the emergence of waste.\",\"PeriodicalId\":426640,\"journal\":{\"name\":\"Journal of Applied Sciences, Management and Engineering Technology\",\"volume\":\"102 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Applied Sciences, Management and Engineering Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31284/j.jasmet.2022.v3i2.3045\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Applied Sciences, Management and Engineering Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31284/j.jasmet.2022.v3i2.3045","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

机电水暖(MEP)工作是建筑工程中的一项工作,在工人进行结构工作后进行实施。材料的使用在工程总成本中占有重要的地位,如果使用不可控,就会产生浪费。本研究的目的是确定JIT在泗水利登酒店电气工作中的应用。研究人员在Leedon酒店项目中实施JIT之前的情况是,由于设计变更,项目与总部之间缺乏协调,以及材料库存过剩而导致的浪费。作为机电材料存储的仓库规模有限,使得物料存储不是最优的,有可能产生浪费。以准时制方法在利登酒店项目中的应用为基础,着重探讨了准时制在现场通过计划-需求-使用来消除浪费的概念。有限的仓库条件仍然可以进行物料控制,而不使用多余的物料库存,这对尽量减少浪费的产生有影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Just in Time on Mechanical and Electrical Implementation in Leedon Hotel Surabaya
Mechanical electrical and plumbing (MEP) job is a job in construction project and the implementation is conducted after the workers conduct structural work. The use of materials has an important part from project total cost because waste will be happened if it is used uncontrollable. The aim of this study was identifying JIT application to electrical work in Leedon Hotel Surabaya. The condition before the researcher implemented JIT in Leedon Hotel project, it was identified waste caused by design change, lack of coordination between project and Head Office, and materials availability with excess material stocks. The limited size of the warehouse as MEP materials storage made the material storage not optimal and it had potential to be waste. Applying just in time concept had a focus on waste elimination by planning - needs - use in the field based on the application of JIT method in the Leedon Hotel project. Limited warehouse conditions could still carry out material control without using excess material inventory which had an impact on minimizing the emergence of waste.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信