停机优化与停机风险

R. G. Orendi, D. Petráš, S. Prokopovich, R. R. Oft
{"title":"停机优化与停机风险","authors":"R. G. Orendi, D. Petráš, S. Prokopovich, R. R. Oft","doi":"10.1109/HFPP.1992.283421","DOIUrl":null,"url":null,"abstract":"A description and results of Westinghouse evaluation of some of the key issues encountered in optimizing outage activities and in reducing shutdown risks are presented. Specific topics addressed include: the outage optimization process; the assessment and evaluation of the outage schedule; mid-loop considerations; support equipment; and human performance issues. It has been determined that cost effective plant enhancements in the form of plant/equipment modifications, changes to licensing requirements, stricter administrative controls, proper outage planning, upgraded procedures, and enhanced training can be implemented to reduce outage time, operations and maintenance costs, and man-rem exposure.<<ETX>>","PeriodicalId":150946,"journal":{"name":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-06-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Outage optimization versus shutdown risk\",\"authors\":\"R. G. Orendi, D. Petráš, S. Prokopovich, R. R. Oft\",\"doi\":\"10.1109/HFPP.1992.283421\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A description and results of Westinghouse evaluation of some of the key issues encountered in optimizing outage activities and in reducing shutdown risks are presented. Specific topics addressed include: the outage optimization process; the assessment and evaluation of the outage schedule; mid-loop considerations; support equipment; and human performance issues. It has been determined that cost effective plant enhancements in the form of plant/equipment modifications, changes to licensing requirements, stricter administrative controls, proper outage planning, upgraded procedures, and enhanced training can be implemented to reduce outage time, operations and maintenance costs, and man-rem exposure.<<ETX>>\",\"PeriodicalId\":150946,\"journal\":{\"name\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1992-06-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HFPP.1992.283421\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record for 1992 Fifth Conference on Human Factors and Power Plants","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HFPP.1992.283421","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

介绍了西屋公司对优化停运活动和降低停运风险所遇到的一些关键问题的评估结果。具体讨论的主题包括:停机优化过程;停机计划的评估与评价;mid-loop考虑;支持设备;以及人的表现问题。已经确定,通过对工厂/设备进行修改、更改许可要求、更严格的行政控制、适当的停机计划、升级程序和加强培训,可以实施具有成本效益的工厂改进措施,以减少停机时间、操作和维护成本,以及对人工智能的影响
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Outage optimization versus shutdown risk
A description and results of Westinghouse evaluation of some of the key issues encountered in optimizing outage activities and in reducing shutdown risks are presented. Specific topics addressed include: the outage optimization process; the assessment and evaluation of the outage schedule; mid-loop considerations; support equipment; and human performance issues. It has been determined that cost effective plant enhancements in the form of plant/equipment modifications, changes to licensing requirements, stricter administrative controls, proper outage planning, upgraded procedures, and enhanced training can be implemented to reduce outage time, operations and maintenance costs, and man-rem exposure.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信