简化配电系统中分布式发电与无功的优化配置

R. Salas, Ozy D. Melgar-Dominguez, J. Mantovani
{"title":"简化配电系统中分布式发电与无功的优化配置","authors":"R. Salas, Ozy D. Melgar-Dominguez, J. Mantovani","doi":"10.1109/TDLA47668.2020.9326238","DOIUrl":null,"url":null,"abstract":"This work presents a novel strategy to solve a short-term planning problem for electrical distribution systems (EDSs) by taking advantage of the implementation of a simplification technique. This simplification technique removes nodes and circuits from the original EDS to reduce the number of variables to be considered in the planning stage. The planning problem is formulated as a mixed-integer linear programming problem and its solution determines the optimal allocation of capacitor banks (CBs) and wind-based distributed generation (DG) units. To validate the proposed strategy, three different test cases are analyzed using a 134-node system and its respective simplified 23-node EDS. Numerical results show that similar investment plans for the both systems can be obtained.","PeriodicalId":448644,"journal":{"name":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Optimal Allocation of Distributed Generation and Reactive Power in Simplified Distribution systems\",\"authors\":\"R. Salas, Ozy D. Melgar-Dominguez, J. Mantovani\",\"doi\":\"10.1109/TDLA47668.2020.9326238\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work presents a novel strategy to solve a short-term planning problem for electrical distribution systems (EDSs) by taking advantage of the implementation of a simplification technique. This simplification technique removes nodes and circuits from the original EDS to reduce the number of variables to be considered in the planning stage. The planning problem is formulated as a mixed-integer linear programming problem and its solution determines the optimal allocation of capacitor banks (CBs) and wind-based distributed generation (DG) units. To validate the proposed strategy, three different test cases are analyzed using a 134-node system and its respective simplified 23-node EDS. Numerical results show that similar investment plans for the both systems can be obtained.\",\"PeriodicalId\":448644,\"journal\":{\"name\":\"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDLA47668.2020.9326238\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE PES Transmission & Distribution Conference and Exhibition - Latin America (T&D LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDLA47668.2020.9326238","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文提出了一种新的策略,利用简化技术的实施来解决配电系统(eds)的短期规划问题。这种简化技术从原始EDS中删除了节点和电路,以减少在规划阶段需要考虑的变量数量。该规划问题被表述为一个混合整数线性规划问题,其解决定了电容器组和风电分布式发电机组的最优配置。为了验证所提出的策略,使用134节点系统及其各自简化的23节点EDS分析了三个不同的测试用例。数值结果表明,两种系统的投资方案相似。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimal Allocation of Distributed Generation and Reactive Power in Simplified Distribution systems
This work presents a novel strategy to solve a short-term planning problem for electrical distribution systems (EDSs) by taking advantage of the implementation of a simplification technique. This simplification technique removes nodes and circuits from the original EDS to reduce the number of variables to be considered in the planning stage. The planning problem is formulated as a mixed-integer linear programming problem and its solution determines the optimal allocation of capacitor banks (CBs) and wind-based distributed generation (DG) units. To validate the proposed strategy, three different test cases are analyzed using a 134-node system and its respective simplified 23-node EDS. Numerical results show that similar investment plans for the both systems can be obtained.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信