J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song
{"title":"韩国电力系统输电线路拥塞的决策方法","authors":"J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song","doi":"10.1109/ICPST.2000.898178","DOIUrl":null,"url":null,"abstract":"In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A decision making method for congested transmission lines of KEPCO system\",\"authors\":\"J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song\",\"doi\":\"10.1109/ICPST.2000.898178\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.\",\"PeriodicalId\":330989,\"journal\":{\"name\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2000.898178\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.898178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

本文运用模糊理论对考虑不确定因素的输电线路加固规划的主观准则进行量化。由于该方法易于应用于电力系统规划等多属性决策问题,本文还采用Sugeno模糊积分对算法进行验证,并利用1998年韩国电力公司(KEPCO) 345 kV输电线路的突发事件分析结果,寻找最大负荷供应能力(MLSC)较小的瓶颈线。提出了几种可行的线路加固方案,解决了韩电系统的瓶颈问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A decision making method for congested transmission lines of KEPCO system
In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信