J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song
{"title":"韩国电力系统输电线路拥塞的决策方法","authors":"J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song","doi":"10.1109/ICPST.2000.898178","DOIUrl":null,"url":null,"abstract":"In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A decision making method for congested transmission lines of KEPCO system\",\"authors\":\"J. Cha, Kwangcheol Oh, Byongjun Lee, Kil-Yeong Song\",\"doi\":\"10.1109/ICPST.2000.898178\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.\",\"PeriodicalId\":330989,\"journal\":{\"name\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2000.898178\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.898178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A decision making method for congested transmission lines of KEPCO system
In this paper, fuzzy theory is used to quantify some subjective criteria to consider uncertain factors for transmission line reinforcement planning. As it can be easily applied to multi attribute decision making problems such as power system planning, Sugeno's fuzzy integral is also used in the proposed method to verify the proposed algorithm, some bottle-neck lines are searched for the case that the amount of maximal load supplying capability (MLSC) is small using the results of contingency analysis for Korea Electric Power Corporation (KEPCO)'s 345 kV transmission line in 1998. Several feasible alternatives are composed for line reinforcement which can solve the bottle-neck problem in the KEPCO system.