{"title":"利用自动监测和地震登记系统监测水电站大坝技术状况","authors":"Alexander V. Kuzmenko, Darya Vorobyeva, E. Zolotukhin","doi":"10.1109/PEAM.2012.6612505","DOIUrl":null,"url":null,"abstract":"An approach is described that has been developed for auxiliary monitoring of technical condition of hydropower plant dams. It is based on analysis of changes in dynamic characteristics of dams obtained by an automated monitoring and earthquake registration system that records microseismic vibrations of structures. The configuration of the system as well as the results of seismometric monitoring of the dam of Krasnoyarsk hydroelectric power plant are described. To study behavior of the dam under normal and extreme loads it was proposed to develop a model of the dam with the use of the finite element method.","PeriodicalId":130967,"journal":{"name":"2012 Power Engineering and Automation Conference","volume":"55 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Monitoring the technical condition of dams of hydroelectric power plants with an automated monitoring and earthquake registration system\",\"authors\":\"Alexander V. Kuzmenko, Darya Vorobyeva, E. Zolotukhin\",\"doi\":\"10.1109/PEAM.2012.6612505\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An approach is described that has been developed for auxiliary monitoring of technical condition of hydropower plant dams. It is based on analysis of changes in dynamic characteristics of dams obtained by an automated monitoring and earthquake registration system that records microseismic vibrations of structures. The configuration of the system as well as the results of seismometric monitoring of the dam of Krasnoyarsk hydroelectric power plant are described. To study behavior of the dam under normal and extreme loads it was proposed to develop a model of the dam with the use of the finite element method.\",\"PeriodicalId\":130967,\"journal\":{\"name\":\"2012 Power Engineering and Automation Conference\",\"volume\":\"55 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 Power Engineering and Automation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PEAM.2012.6612505\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 Power Engineering and Automation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEAM.2012.6612505","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

介绍了一种水电站大坝技术状态辅助监测的方法。它是基于对大坝动力特性变化的分析,这些变化是由记录结构微震振动的自动监测和地震登记系统获得的。介绍了该系统的组成及克拉斯诺亚尔斯克水电站大坝的地震监测结果。为了研究大坝在正常荷载和极限荷载作用下的受力特性,提出了用有限元方法建立大坝模型的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Monitoring the technical condition of dams of hydroelectric power plants with an automated monitoring and earthquake registration system
An approach is described that has been developed for auxiliary monitoring of technical condition of hydropower plant dams. It is based on analysis of changes in dynamic characteristics of dams obtained by an automated monitoring and earthquake registration system that records microseismic vibrations of structures. The configuration of the system as well as the results of seismometric monitoring of the dam of Krasnoyarsk hydroelectric power plant are described. To study behavior of the dam under normal and extreme loads it was proposed to develop a model of the dam with the use of the finite element method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信