{"title":"大容量输电系统在正常和故障情况下的暂态并联电抗器尺寸","authors":"M. Ramold, G. Idarraga, J. Jager","doi":"10.1109/ICPST.2006.321927","DOIUrl":null,"url":null,"abstract":"This paper presents an analysis of a 500 kV bulk power transmission system and the dimensioning of proper shunt reactors to be applied under steady state and transient aspects in particular. Therefore, the behavior of single-pole auto-reclosing under line-to-ground fault conditions is analyzed. Hence is described the necessity and influence of factors such as phase and neutral reactors, capacitive and inductive couplings on the extinction of secondary arc. Those are investigated in order to justify the feasibility of single-pole auto-reclosing. A practical example of the system is developed with respect to an investigation of the impact of neutral reactors. The considerations have been firstly done analytically and verified subsequently based on transient simulations using ATP/EMTP.","PeriodicalId":181574,"journal":{"name":"2006 International Conference on Power System Technology","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"12","resultStr":"{\"title\":\"Transient shunt reactor dimensioning for bulk power transmission systems during normal and faulty network conditions\",\"authors\":\"M. Ramold, G. Idarraga, J. Jager\",\"doi\":\"10.1109/ICPST.2006.321927\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an analysis of a 500 kV bulk power transmission system and the dimensioning of proper shunt reactors to be applied under steady state and transient aspects in particular. Therefore, the behavior of single-pole auto-reclosing under line-to-ground fault conditions is analyzed. Hence is described the necessity and influence of factors such as phase and neutral reactors, capacitive and inductive couplings on the extinction of secondary arc. Those are investigated in order to justify the feasibility of single-pole auto-reclosing. A practical example of the system is developed with respect to an investigation of the impact of neutral reactors. The considerations have been firstly done analytically and verified subsequently based on transient simulations using ATP/EMTP.\",\"PeriodicalId\":181574,\"journal\":{\"name\":\"2006 International Conference on Power System Technology\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"12\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 International Conference on Power System Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2006.321927\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 International Conference on Power System Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2006.321927","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 12

摘要

本文对500kv大容量输电系统进行了分析,并着重讨论了在稳态和暂态工况下并联电抗器的尺寸。因此,对线路对地故障条件下的单极自合闸行为进行了分析。由此论述了相电抗器和中性电抗器、电容联轴器和电感联轴器等因素对二次电弧消弧的必要性和影响。为了证明单极自动重合闸的可行性,对这些进行了研究。通过对中性反应堆影响的研究,开发了该系统的一个实例。首先对这些考虑进行了分析,然后基于ATP/EMTP的瞬态模拟进行了验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transient shunt reactor dimensioning for bulk power transmission systems during normal and faulty network conditions
This paper presents an analysis of a 500 kV bulk power transmission system and the dimensioning of proper shunt reactors to be applied under steady state and transient aspects in particular. Therefore, the behavior of single-pole auto-reclosing under line-to-ground fault conditions is analyzed. Hence is described the necessity and influence of factors such as phase and neutral reactors, capacitive and inductive couplings on the extinction of secondary arc. Those are investigated in order to justify the feasibility of single-pole auto-reclosing. A practical example of the system is developed with respect to an investigation of the impact of neutral reactors. The considerations have been firstly done analytically and verified subsequently based on transient simulations using ATP/EMTP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信