影响泰国建筑业劳动生产率的因素

Patraporn Porntepkasemsant, Santi Charoenpornpattana
{"title":"影响泰国建筑业劳动生产率的因素","authors":"Patraporn Porntepkasemsant, Santi Charoenpornpattana","doi":"10.1109/IEOM.2015.7093749","DOIUrl":null,"url":null,"abstract":"The construction industry is one of the most significant economics drivers of a country. However, there are many construction projects have a low labor productivity problem which leads project delaying and cost of the project overrunning. The objective of this study is to determine the factors effecting construction productivity in construction project in Thailand. A structured questionnaire survey was conducted and completed by 55 Thai construction contractors who involve in construction project in Thailand. The five highest ranking factors effecting labor productivity were absenteeism of worker; labor skill and experience; financial shortage; inspection and instruction delay; incomplete drawings. This study finding can be applied for labor productivity improvement in construction project. The project manager should focus on these factors at the early stage of construction project to gain effective results in productivity.","PeriodicalId":410110,"journal":{"name":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-03-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Factor affecting construction labor productivity in Thailand\",\"authors\":\"Patraporn Porntepkasemsant, Santi Charoenpornpattana\",\"doi\":\"10.1109/IEOM.2015.7093749\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The construction industry is one of the most significant economics drivers of a country. However, there are many construction projects have a low labor productivity problem which leads project delaying and cost of the project overrunning. The objective of this study is to determine the factors effecting construction productivity in construction project in Thailand. A structured questionnaire survey was conducted and completed by 55 Thai construction contractors who involve in construction project in Thailand. The five highest ranking factors effecting labor productivity were absenteeism of worker; labor skill and experience; financial shortage; inspection and instruction delay; incomplete drawings. This study finding can be applied for labor productivity improvement in construction project. The project manager should focus on these factors at the early stage of construction project to gain effective results in productivity.\",\"PeriodicalId\":410110,\"journal\":{\"name\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-03-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Industrial Engineering and Operations Management (IEOM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEOM.2015.7093749\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Operations Management (IEOM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEOM.2015.7093749","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

摘要

建筑业是一个国家最重要的经济驱动力之一。然而,许多建设项目存在劳动生产率低的问题,导致工程延误和工程成本超支。本研究的目的是确定泰国建设项目中影响建筑生产力的因素。本文采用结构化问卷调查的方法,对55名参与泰国建设项目的泰国建筑承包商进行了问卷调查。影响劳动生产率排名前五位的因素是工人缺勤;劳动技能和经验;金融短缺;检查和指令延迟;不完整的图纸。研究结果可为提高建设工程的劳动生产率提供参考。项目经理应在建设项目的早期阶段关注这些因素,以获得有效的生产力成果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Factor affecting construction labor productivity in Thailand
The construction industry is one of the most significant economics drivers of a country. However, there are many construction projects have a low labor productivity problem which leads project delaying and cost of the project overrunning. The objective of this study is to determine the factors effecting construction productivity in construction project in Thailand. A structured questionnaire survey was conducted and completed by 55 Thai construction contractors who involve in construction project in Thailand. The five highest ranking factors effecting labor productivity were absenteeism of worker; labor skill and experience; financial shortage; inspection and instruction delay; incomplete drawings. This study finding can be applied for labor productivity improvement in construction project. The project manager should focus on these factors at the early stage of construction project to gain effective results in productivity.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信