分布式电源与电力系统互联IEEE标准P1547制定现状

R. Deblasio, T. Basso
{"title":"分布式电源与电力系统互联IEEE标准P1547制定现状","authors":"R. Deblasio, T. Basso","doi":"10.1109/TDC.2001.971367","DOIUrl":null,"url":null,"abstract":"There are major issues and obstacles to an orderly transition to using and integrating all distributed power resources with electric power systems (grid or utility grid). The lack of national interconnection standards and tests for interconnection operation and certification, as well as the lack of national building, electrical, and safety codes, are understood and resolving that needs reasonable lead time to develop and promulgate consensus. The IEEE P1547 interconnection standard should prove to be a benchmark milestone for both the IEEE standards consensus process and as a model for developing further national standards dedicated to the ongoing success of our nation's electric power system. Based on a fast-track timeline, the P1547 working group voted unanimously to complete a final P1547 draft so it could be ready for submittal to the IEEE Standards Association Standards Board for no later than their December 2001 meeting. The working group met its target of March 2001 for a balloted P1547 draft.","PeriodicalId":182269,"journal":{"name":"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2001-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"19","resultStr":"{\"title\":\"Status on developing IEEE standard P1547 for distributed power resources and electric power systems interconnection\",\"authors\":\"R. Deblasio, T. Basso\",\"doi\":\"10.1109/TDC.2001.971367\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"There are major issues and obstacles to an orderly transition to using and integrating all distributed power resources with electric power systems (grid or utility grid). The lack of national interconnection standards and tests for interconnection operation and certification, as well as the lack of national building, electrical, and safety codes, are understood and resolving that needs reasonable lead time to develop and promulgate consensus. The IEEE P1547 interconnection standard should prove to be a benchmark milestone for both the IEEE standards consensus process and as a model for developing further national standards dedicated to the ongoing success of our nation's electric power system. Based on a fast-track timeline, the P1547 working group voted unanimously to complete a final P1547 draft so it could be ready for submittal to the IEEE Standards Association Standards Board for no later than their December 2001 meeting. The working group met its target of March 2001 for a balloted P1547 draft.\",\"PeriodicalId\":182269,\"journal\":{\"name\":\"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2001-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"19\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC.2001.971367\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2001 IEEE/PES Transmission and Distribution Conference and Exposition. Developing New Perspectives (Cat. No.01CH37294)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2001.971367","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 19

摘要

所有分布式电力资源与电力系统(电网或公用电网)的利用和整合有序过渡存在重大问题和障碍。缺乏国家互连标准和互连操作和认证测试,以及缺乏国家建筑、电气和安全规范,这些都是可以理解的,解决这些问题需要合理的前置时间来制定和颁布共识。IEEE P1547互连标准应被证明是IEEE标准共识过程的一个基准里程碑,并作为制定进一步的国家标准的典范,致力于我国电力系统的持续成功。基于快速的时间表,P1547工作组一致投票完成了最终的P1547草案,这样它就可以准备好提交给IEEE标准协会标准委员会,不迟于2001年12月的会议。工作组实现了2001年3月对P1547草案进行表决的目标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Status on developing IEEE standard P1547 for distributed power resources and electric power systems interconnection
There are major issues and obstacles to an orderly transition to using and integrating all distributed power resources with electric power systems (grid or utility grid). The lack of national interconnection standards and tests for interconnection operation and certification, as well as the lack of national building, electrical, and safety codes, are understood and resolving that needs reasonable lead time to develop and promulgate consensus. The IEEE P1547 interconnection standard should prove to be a benchmark milestone for both the IEEE standards consensus process and as a model for developing further national standards dedicated to the ongoing success of our nation's electric power system. Based on a fast-track timeline, the P1547 working group voted unanimously to complete a final P1547 draft so it could be ready for submittal to the IEEE Standards Association Standards Board for no later than their December 2001 meeting. The working group met its target of March 2001 for a balloted P1547 draft.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信