{"title":"描绘欧盟“权力目标模式”的历程……以自己的方式","authors":"J. Glachant","doi":"10.2139/ssrn.2771983","DOIUrl":null,"url":null,"abstract":"The European Union took more than 20 years to start defining a common market design for its internal electricity market: a European Power Target Model. And, a further 10 years to fully implement it. Meanwhile, the reference generation set of that model has shifted from CCGT burning gas to RES units transforming intermittent natural resources. Could the existing EU target model continue to work well for the short- term operation and long-term investment? If not, can the existing EU institutions easily produce an \"RES resilient\" new power target model?","PeriodicalId":300963,"journal":{"name":"Robert Schuman Centre for Advanced Studies (RSCAS) Research Paper Series","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Mapping the Course of the EU 'Power Target Model'...On Its Own Terms\",\"authors\":\"J. Glachant\",\"doi\":\"10.2139/ssrn.2771983\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The European Union took more than 20 years to start defining a common market design for its internal electricity market: a European Power Target Model. And, a further 10 years to fully implement it. Meanwhile, the reference generation set of that model has shifted from CCGT burning gas to RES units transforming intermittent natural resources. Could the existing EU target model continue to work well for the short- term operation and long-term investment? If not, can the existing EU institutions easily produce an \\\"RES resilient\\\" new power target model?\",\"PeriodicalId\":300963,\"journal\":{\"name\":\"Robert Schuman Centre for Advanced Studies (RSCAS) Research Paper Series\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Robert Schuman Centre for Advanced Studies (RSCAS) Research Paper Series\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.2771983\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Robert Schuman Centre for Advanced Studies (RSCAS) Research Paper Series","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.2771983","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Mapping the Course of the EU 'Power Target Model'...On Its Own Terms
The European Union took more than 20 years to start defining a common market design for its internal electricity market: a European Power Target Model. And, a further 10 years to fully implement it. Meanwhile, the reference generation set of that model has shifted from CCGT burning gas to RES units transforming intermittent natural resources. Could the existing EU target model continue to work well for the short- term operation and long-term investment? If not, can the existing EU institutions easily produce an "RES resilient" new power target model?