{"title":"分析供应链风险管理对矿业承重设备产品的分析","authors":"Muhamad Atho R, Sawarni Hasibuan","doi":"10.22441/oe.2022.v14.i1.046","DOIUrl":null,"url":null,"abstract":"Manufacturing activities such as trailer products potentially generate various risks. This research aims to analyze risk management in the supply chain of trailer production using the House of Risk (HOR) model. The business activities mapping is using the Supply Chain Operations Reference (SCOR) method which consists of 6 parts of the management process, plan, source, make, deliver return and enable. Research is conducted through two phases of HOR. The HOR 1 activities are the identification of risk events and risk agents based on SCOR mapping, measurement of severity, and occurrence levels to produce an Aggregate Risk Priority (ARP), then determine a priority risk agent in the mitigation process. The HOR 2 is used to determine which actions are to be done first, considering their differing effectiveness as well as resources involved and the degree of difficulties in performing. The company should ideally select a set of actions that are not so difficult to perform but could effectively reduce the probability of risk agents occurring. 7 experience respondents were involved in the study consisting of engineering, procurement, production, warehouse, production planning, after-sales dan quality control. The results of the analysis successfully identified 46 risk events and 41 risk agents in the manufacturing of mining trailers. FGD and Pareto analysis used in the study produced 16 recommendations for mitigation actions that are expected to be able to mitigate risk.","PeriodicalId":345326,"journal":{"name":"Operations Excellence: Journal of Applied Industrial Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analisis Manajemen Risiko Rantai Pasok Pada Produk Alat Berat Penunjang Industri Pertambangan\",\"authors\":\"Muhamad Atho R, Sawarni Hasibuan\",\"doi\":\"10.22441/oe.2022.v14.i1.046\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Manufacturing activities such as trailer products potentially generate various risks. This research aims to analyze risk management in the supply chain of trailer production using the House of Risk (HOR) model. The business activities mapping is using the Supply Chain Operations Reference (SCOR) method which consists of 6 parts of the management process, plan, source, make, deliver return and enable. Research is conducted through two phases of HOR. The HOR 1 activities are the identification of risk events and risk agents based on SCOR mapping, measurement of severity, and occurrence levels to produce an Aggregate Risk Priority (ARP), then determine a priority risk agent in the mitigation process. The HOR 2 is used to determine which actions are to be done first, considering their differing effectiveness as well as resources involved and the degree of difficulties in performing. The company should ideally select a set of actions that are not so difficult to perform but could effectively reduce the probability of risk agents occurring. 7 experience respondents were involved in the study consisting of engineering, procurement, production, warehouse, production planning, after-sales dan quality control. The results of the analysis successfully identified 46 risk events and 41 risk agents in the manufacturing of mining trailers. FGD and Pareto analysis used in the study produced 16 recommendations for mitigation actions that are expected to be able to mitigate risk.\",\"PeriodicalId\":345326,\"journal\":{\"name\":\"Operations Excellence: Journal of Applied Industrial Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Operations Excellence: Journal of Applied Industrial Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22441/oe.2022.v14.i1.046\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Operations Excellence: Journal of Applied Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22441/oe.2022.v14.i1.046","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

制造活动,如拖车产品,可能会产生各种风险。本研究旨在运用风险屋(House of risk, HOR)模型分析拖车生产供应链中的风险管理。业务活动映射使用供应链操作参考(SCOR)方法,该方法由管理过程、计划、来源、制造、交付回报和启用6个部分组成。研究通过HOR的两个阶段进行。HOR 1活动是基于SCOR映射、严重程度度量和发生级别识别风险事件和风险代理,以产生总风险优先级(ARP),然后在缓解过程中确定优先级风险代理。考虑到不同行动的成效、所涉及的资源和执行工作的困难程度,评估第二次评估是用来决定首先采取哪些行动。理想情况下,公司应该选择一组操作不那么困难,但可以有效地减少风险因素发生的可能性。7名经验受访者参与了包括工程、采购、生产、仓储、生产计划、售后丹质量控制在内的研究。分析结果成功识别了矿用拖车制造过程中的46个风险事件和41个风险因子。研究中使用的FGD和Pareto分析提出了16项缓解行动建议,预计能够减轻风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analisis Manajemen Risiko Rantai Pasok Pada Produk Alat Berat Penunjang Industri Pertambangan
Manufacturing activities such as trailer products potentially generate various risks. This research aims to analyze risk management in the supply chain of trailer production using the House of Risk (HOR) model. The business activities mapping is using the Supply Chain Operations Reference (SCOR) method which consists of 6 parts of the management process, plan, source, make, deliver return and enable. Research is conducted through two phases of HOR. The HOR 1 activities are the identification of risk events and risk agents based on SCOR mapping, measurement of severity, and occurrence levels to produce an Aggregate Risk Priority (ARP), then determine a priority risk agent in the mitigation process. The HOR 2 is used to determine which actions are to be done first, considering their differing effectiveness as well as resources involved and the degree of difficulties in performing. The company should ideally select a set of actions that are not so difficult to perform but could effectively reduce the probability of risk agents occurring. 7 experience respondents were involved in the study consisting of engineering, procurement, production, warehouse, production planning, after-sales dan quality control. The results of the analysis successfully identified 46 risk events and 41 risk agents in the manufacturing of mining trailers. FGD and Pareto analysis used in the study produced 16 recommendations for mitigation actions that are expected to be able to mitigate risk.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信