{"title":"新环境下最优发电扩展规划的有效DP解","authors":"N. Jia, R. Yokoyama, Y.C. Zhou, U.A. Kozu","doi":"10.1109/ICPST.2000.900028","DOIUrl":null,"url":null,"abstract":"Under the existing electricity market in Japan, partial retail wheeling in a power generation system has been implemented accompanying the independent power producers' (IPPs) tender for the part of electric power generation of a utility. At same time, the environmental problem (CO/sub 2/ emission etc) is becoming a more and more important task to solve. For utility companies, the IPPs' participation and environmental impact should be considered simultaneously when making an optimal generation expansion plan under new environment. This paper discusses the probability of IPPs' participant for a utility company and proposes an approach for determining the optimal generation mix including IPPs under limited CO/sub 2/ emission. Based on the successive approximations DP (SADP) algorithm, an optimal generation expansion plan including IPPs, which coordinates the economy and supply reliability is obtained. The feasibility of the proposed approach is demonstrated by using a test power system.","PeriodicalId":330989,"journal":{"name":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"20","resultStr":"{\"title\":\"An effective DP solution for optimal generation expansion planning under new environment\",\"authors\":\"N. Jia, R. Yokoyama, Y.C. Zhou, U.A. Kozu\",\"doi\":\"10.1109/ICPST.2000.900028\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Under the existing electricity market in Japan, partial retail wheeling in a power generation system has been implemented accompanying the independent power producers' (IPPs) tender for the part of electric power generation of a utility. At same time, the environmental problem (CO/sub 2/ emission etc) is becoming a more and more important task to solve. For utility companies, the IPPs' participation and environmental impact should be considered simultaneously when making an optimal generation expansion plan under new environment. This paper discusses the probability of IPPs' participant for a utility company and proposes an approach for determining the optimal generation mix including IPPs under limited CO/sub 2/ emission. Based on the successive approximations DP (SADP) algorithm, an optimal generation expansion plan including IPPs, which coordinates the economy and supply reliability is obtained. The feasibility of the proposed approach is demonstrated by using a test power system.\",\"PeriodicalId\":330989,\"journal\":{\"name\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"20\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPST.2000.900028\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"PowerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2000.900028","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 20

摘要

在日本现有的电力市场中,发电系统的部分零售轮转是伴随着独立电力生产商(ipp)对公用事业发电部分的招标而实施的。与此同时,环境问题(CO/sub - 2/排放等)也越来越成为需要解决的重要问题。对于公用事业公司而言,在制定新环境下的最优扩容方案时,应同时考虑电站的参与和对环境的影响。本文讨论了公用事业公司ipp参与的概率,提出了在CO/sub /排放量有限的情况下确定包括ipp在内的最优发电组合的方法。基于逐次逼近DP (SADP)算法,得到了兼顾经济效益和供电可靠性的包含ipp的最优扩容方案。通过测试电源系统验证了该方法的可行性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An effective DP solution for optimal generation expansion planning under new environment
Under the existing electricity market in Japan, partial retail wheeling in a power generation system has been implemented accompanying the independent power producers' (IPPs) tender for the part of electric power generation of a utility. At same time, the environmental problem (CO/sub 2/ emission etc) is becoming a more and more important task to solve. For utility companies, the IPPs' participation and environmental impact should be considered simultaneously when making an optimal generation expansion plan under new environment. This paper discusses the probability of IPPs' participant for a utility company and proposes an approach for determining the optimal generation mix including IPPs under limited CO/sub 2/ emission. Based on the successive approximations DP (SADP) algorithm, an optimal generation expansion plan including IPPs, which coordinates the economy and supply reliability is obtained. The feasibility of the proposed approach is demonstrated by using a test power system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信