利用帕累托法和鱼骨图分析和评估 Grand Sungkono Langoon 项目结构施工中的建筑垃圾

Salim Syarief
{"title":"利用帕累托法和鱼骨图分析和评估 Grand Sungkono Langoon 项目结构施工中的建筑垃圾","authors":"Salim Syarief","doi":"10.29138/prd.v2i1.119","DOIUrl":null,"url":null,"abstract":"In a construction project, there must be construction waste. The present study aims to find out the quantity, the source, and the factors leading to construction waste. The present study aims to find out the quantity, the source, and the factors resulting in construction waste in Gran Sungkono Langoon Project by using Pareto Method and Fish Bone Diagram. This study also aims to categorize the construction waste in Grand Sungkono Langoon Project based on its type by using Pareto Method and Fish Bone diagram. The present study employed descriptive study with qualitative analysis. It was done by analyzing and evaluating construction waste. The result of the study was in the form of data table on construction waste in structural construction using Pareto method and Fish Bone Diagram in Grand Sungkono Langoon Project. The study found that the most significant amount of material waste in Grand Sungkono Langoon project is steel bar (Rp.229.009.000), total amount of construction waste was 0.92% or equal to Rp 263.090.000 from total project cost of Rp. 24.204.280.000. The source of material waste comes from piles, casting, steelwork and formwork, and the factors resulting in construction waste were the condition of the pile, this can be caused by careless unloading process. Besides, not all piles get into the ground for its condition is different at each point. Regarding reinforcement, it turned into waste because of cutting mistake. The category of construction waste in a structural project is casting, steelwork, and formwork.","PeriodicalId":386863,"journal":{"name":"Journal of World Conference (JWC)","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Analysis And Evaluation Of Construction Waste On Structural Construction In Grand Sungkono Langoon Project By Using Pareto Method And Fishbone Diagram\",\"authors\":\"Salim Syarief\",\"doi\":\"10.29138/prd.v2i1.119\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a construction project, there must be construction waste. The present study aims to find out the quantity, the source, and the factors leading to construction waste. The present study aims to find out the quantity, the source, and the factors resulting in construction waste in Gran Sungkono Langoon Project by using Pareto Method and Fish Bone Diagram. This study also aims to categorize the construction waste in Grand Sungkono Langoon Project based on its type by using Pareto Method and Fish Bone diagram. The present study employed descriptive study with qualitative analysis. It was done by analyzing and evaluating construction waste. The result of the study was in the form of data table on construction waste in structural construction using Pareto method and Fish Bone Diagram in Grand Sungkono Langoon Project. The study found that the most significant amount of material waste in Grand Sungkono Langoon project is steel bar (Rp.229.009.000), total amount of construction waste was 0.92% or equal to Rp 263.090.000 from total project cost of Rp. 24.204.280.000. The source of material waste comes from piles, casting, steelwork and formwork, and the factors resulting in construction waste were the condition of the pile, this can be caused by careless unloading process. Besides, not all piles get into the ground for its condition is different at each point. Regarding reinforcement, it turned into waste because of cutting mistake. The category of construction waste in a structural project is casting, steelwork, and formwork.\",\"PeriodicalId\":386863,\"journal\":{\"name\":\"Journal of World Conference (JWC)\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-08-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of World Conference (JWC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29138/prd.v2i1.119\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of World Conference (JWC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29138/prd.v2i1.119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在建筑项目中,一定会产生建筑垃圾。本研究旨在找出造成建筑垃圾的数量、来源和因素。本研究旨在利用帕累托方法和鱼骨图找出 Gran Sungkono Langoon 项目中建筑垃圾的数量、来源和造成建筑垃圾的因素。本研究还旨在使用帕累托方法和鱼骨图,根据建筑垃圾的类型对 Gran Sungkono Langoon 项目中的建筑垃圾进行分类。本研究采用了定性分析的描述性研究方法。研究是通过分析和评估建筑垃圾来完成的。研究结果以数据表的形式列出,在 Grand Sungkono Langoon 项目中使用帕累托法和鱼骨图对结构施工中的建筑垃圾进行了分析。研究发现,Grand Sungkono Langoon 项目中最主要的材料浪费是钢筋(229 009 000 印尼盾),建筑垃圾总量占项目总成本 24 204 280 000 印尼盾的 0.92%,即 263 090 000 印尼盾。材料废料的来源是桩基、浇注、钢结构和模板,造成建筑废料的因素是桩基的状况,这可能是卸载过程中不小心造成的。此外,并不是所有的桩都能入土,因为每根桩的情况都不一样。在钢筋方面,由于切割错误,钢筋变成了废料。结构工程中的建筑垃圾包括铸件、钢筋和模板。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Analysis And Evaluation Of Construction Waste On Structural Construction In Grand Sungkono Langoon Project By Using Pareto Method And Fishbone Diagram
In a construction project, there must be construction waste. The present study aims to find out the quantity, the source, and the factors leading to construction waste. The present study aims to find out the quantity, the source, and the factors resulting in construction waste in Gran Sungkono Langoon Project by using Pareto Method and Fish Bone Diagram. This study also aims to categorize the construction waste in Grand Sungkono Langoon Project based on its type by using Pareto Method and Fish Bone diagram. The present study employed descriptive study with qualitative analysis. It was done by analyzing and evaluating construction waste. The result of the study was in the form of data table on construction waste in structural construction using Pareto method and Fish Bone Diagram in Grand Sungkono Langoon Project. The study found that the most significant amount of material waste in Grand Sungkono Langoon project is steel bar (Rp.229.009.000), total amount of construction waste was 0.92% or equal to Rp 263.090.000 from total project cost of Rp. 24.204.280.000. The source of material waste comes from piles, casting, steelwork and formwork, and the factors resulting in construction waste were the condition of the pile, this can be caused by careless unloading process. Besides, not all piles get into the ground for its condition is different at each point. Regarding reinforcement, it turned into waste because of cutting mistake. The category of construction waste in a structural project is casting, steelwork, and formwork.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信