{"title":"故障树分析在巴西海底柔性管道退役中的应用","authors":"Rafael Ramos, I. Pasqualino, M. Souza, E. R. Nicolosi","doi":"10.1115/omae2019-96730","DOIUrl":null,"url":null,"abstract":"\n The decommissioning of underwater structures has expanded in recent years, as the number of facilities at the end of their useful lives is increasing and legislation becomes more severe. Unlike the production units which already have their decommissioning plans consolidated, subsea pipelines represent the greatest technological, environmental and financial challenge of this stage. Currently, there are few studies to evaluate failures in the decommissioning of flexible pipelines. In addition, these studies generally use simplified analyses. Therefore, this study aims to elaborate a failure analysis for a Reverse Reeling option, in order to contribute to the decision-making process and reduction of failures. For this, a Fault Tree Analysis will be developed followed by the subsequent elaboration of its minimum cut sets. The main results present a total of 13 first-order minimal cut set, 5 second-order minimal cut set and 7 third-order minimal cut set.","PeriodicalId":190268,"journal":{"name":"Volume 5A: Pipelines, Risers, and Subsea Systems","volume":"38 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Application of Fault Tree Analysis for Decommissioning of Subsea Flexible Pipeline in Brazil\",\"authors\":\"Rafael Ramos, I. Pasqualino, M. Souza, E. R. Nicolosi\",\"doi\":\"10.1115/omae2019-96730\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The decommissioning of underwater structures has expanded in recent years, as the number of facilities at the end of their useful lives is increasing and legislation becomes more severe. Unlike the production units which already have their decommissioning plans consolidated, subsea pipelines represent the greatest technological, environmental and financial challenge of this stage. Currently, there are few studies to evaluate failures in the decommissioning of flexible pipelines. In addition, these studies generally use simplified analyses. Therefore, this study aims to elaborate a failure analysis for a Reverse Reeling option, in order to contribute to the decision-making process and reduction of failures. For this, a Fault Tree Analysis will be developed followed by the subsequent elaboration of its minimum cut sets. The main results present a total of 13 first-order minimal cut set, 5 second-order minimal cut set and 7 third-order minimal cut set.\",\"PeriodicalId\":190268,\"journal\":{\"name\":\"Volume 5A: Pipelines, Risers, and Subsea Systems\",\"volume\":\"38 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 5A: Pipelines, Risers, and Subsea Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/omae2019-96730\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 5A: Pipelines, Risers, and Subsea Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/omae2019-96730","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

近年来,随着使用寿命结束的设施越来越多,立法也越来越严格,水下结构物的退役也越来越多。与已经完成退役计划的生产装置不同,海底管道代表了这一阶段最大的技术、环境和财务挑战。目前,对柔性管道退役失效进行评估的研究较少。此外,这些研究通常使用简化的分析。因此,本研究旨在详细阐述反向缫丝方案的失效分析,以有助于决策过程和减少失败。为此,将开发故障树分析,然后对其最小割集进行后续细化。主要结果得到了13个一阶最小割集、5个二阶最小割集和7个三阶最小割集。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Application of Fault Tree Analysis for Decommissioning of Subsea Flexible Pipeline in Brazil
The decommissioning of underwater structures has expanded in recent years, as the number of facilities at the end of their useful lives is increasing and legislation becomes more severe. Unlike the production units which already have their decommissioning plans consolidated, subsea pipelines represent the greatest technological, environmental and financial challenge of this stage. Currently, there are few studies to evaluate failures in the decommissioning of flexible pipelines. In addition, these studies generally use simplified analyses. Therefore, this study aims to elaborate a failure analysis for a Reverse Reeling option, in order to contribute to the decision-making process and reduction of failures. For this, a Fault Tree Analysis will be developed followed by the subsequent elaboration of its minimum cut sets. The main results present a total of 13 first-order minimal cut set, 5 second-order minimal cut set and 7 third-order minimal cut set.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信