复杂地基条件下隧道穿越通道地基处理的观测方法

T. Sacadura, N. Taylor, J. Gaudon, K. Sevecek, R. Storry, X. Monin
{"title":"复杂地基条件下隧道穿越通道地基处理的观测方法","authors":"T. Sacadura, N. Taylor, J. Gaudon, K. Sevecek, R. Storry, X. Monin","doi":"10.21467/proceedings.133.40","DOIUrl":null,"url":null,"abstract":"This paper focuses on the design and review of the ground treatment and rock fissure grouting required to excavate tunnel Cross-Passages in the Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 2 in Hong Kong SAR. The Cross-Passages were expected to go through Tuff in various degrees of weathering (Grade V to Grade III/II). The Site Investigation, SI, showed that SPTs numbers generally ranged from 30 to 50 for the Completely to Highly Decomposed Tuff, CDT / HDT, with localised values as low as 6. Ground Treatment consisting of permeation and rock fissure grouting as well as 120° pipe roof / canopy tubes, was required to ensure not only the stability during excavation but also limit the groundwater inflow. The SI determined in-situ permeabilities ranging from 1x10-5 to 1x10-6 m/s for the CDT and a 21m long probe hole recorded a water inflow in excess of 60 l/minute. A discussion relative to the methods employed for drilling, e.g. pressure balance drilling system, drilling alignment tools used, and grouting techniques, e.g. microfine cement, chemical grout is presented in this paper. The use of drilling survey tools integrated with 3D representation models of the cross-passage and the ground treatment is discussed. A review of the overall performance of the Cross-Passage, e.g. groundwater inflow, stability, is undertaken.","PeriodicalId":379153,"journal":{"name":"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Observational Method for Ground Treatment of Tunnel Cross Passages in Complex Ground Conditions\",\"authors\":\"T. Sacadura, N. Taylor, J. Gaudon, K. Sevecek, R. Storry, X. Monin\",\"doi\":\"10.21467/proceedings.133.40\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper focuses on the design and review of the ground treatment and rock fissure grouting required to excavate tunnel Cross-Passages in the Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 2 in Hong Kong SAR. The Cross-Passages were expected to go through Tuff in various degrees of weathering (Grade V to Grade III/II). The Site Investigation, SI, showed that SPTs numbers generally ranged from 30 to 50 for the Completely to Highly Decomposed Tuff, CDT / HDT, with localised values as low as 6. Ground Treatment consisting of permeation and rock fissure grouting as well as 120° pipe roof / canopy tubes, was required to ensure not only the stability during excavation but also limit the groundwater inflow. The SI determined in-situ permeabilities ranging from 1x10-5 to 1x10-6 m/s for the CDT and a 21m long probe hole recorded a water inflow in excess of 60 l/minute. A discussion relative to the methods employed for drilling, e.g. pressure balance drilling system, drilling alignment tools used, and grouting techniques, e.g. microfine cement, chemical grout is presented in this paper. The use of drilling survey tools integrated with 3D representation models of the cross-passage and the ground treatment is discussed. A review of the overall performance of the Cross-Passage, e.g. groundwater inflow, stability, is undertaken.\",\"PeriodicalId\":379153,\"journal\":{\"name\":\"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21467/proceedings.133.40\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of The HKIE Geotechnical Division 42nd Annual Seminar: A New Era of Metropolis and Infrastructure Developments in Hong Kong, Challenges and Opportunities to Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21467/proceedings.133.40","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文重点介绍香港特别行政区莲塘/香园围边境管制站地盘平整及基建工程合约二工程中挖掘隧道通道所需的地基处理及岩石裂隙灌浆的设计及检讨。隧道通道预计将穿过不同风化程度(V级至III/II级)的凝灰岩。现场调查(SI)显示,完全到高度分解凝灰岩(CDT / HDT)的spt值一般在30到50之间,局部值低至6。地基处理包括渗水、岩体裂隙灌浆和120°管顶/顶棚管,既保证开挖时的稳定性,又限制地下水的流入。SI测定了CDT的原位渗透率范围为1x10-5至1x10-6 m/s,一个21m长的探测孔记录了超过60l /分钟的水流入。本文讨论了钻井所采用的方法,如压力平衡钻井系统,所使用的钻井对准工具,以及注浆技术,如微细水泥,化学浆液。讨论了结合交叉通道三维表示模型和地面处理的钻井测量工具的使用。对穿越通道的整体性能进行审查,例如地下水流入,稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Observational Method for Ground Treatment of Tunnel Cross Passages in Complex Ground Conditions
This paper focuses on the design and review of the ground treatment and rock fissure grouting required to excavate tunnel Cross-Passages in the Liantang / Heung Yuen Wai Boundary Control Point Site Formation and Infrastructure Works – Contract 2 in Hong Kong SAR. The Cross-Passages were expected to go through Tuff in various degrees of weathering (Grade V to Grade III/II). The Site Investigation, SI, showed that SPTs numbers generally ranged from 30 to 50 for the Completely to Highly Decomposed Tuff, CDT / HDT, with localised values as low as 6. Ground Treatment consisting of permeation and rock fissure grouting as well as 120° pipe roof / canopy tubes, was required to ensure not only the stability during excavation but also limit the groundwater inflow. The SI determined in-situ permeabilities ranging from 1x10-5 to 1x10-6 m/s for the CDT and a 21m long probe hole recorded a water inflow in excess of 60 l/minute. A discussion relative to the methods employed for drilling, e.g. pressure balance drilling system, drilling alignment tools used, and grouting techniques, e.g. microfine cement, chemical grout is presented in this paper. The use of drilling survey tools integrated with 3D representation models of the cross-passage and the ground treatment is discussed. A review of the overall performance of the Cross-Passage, e.g. groundwater inflow, stability, is undertaken.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信