小型企业建筑工程限额(香蕉河吊桥研究案例)

A. Rusli
{"title":"小型企业建筑工程限额(香蕉河吊桥研究案例)","authors":"A. Rusli","doi":"10.26593/jhpji.v9i1.6436.17-26","DOIUrl":null,"url":null,"abstract":"Abstract \n  \nPresidential Regulation of the Republic of Indonesia Number 12 of 2021 contains an increase in the ceiling limit for construction work for small businesses to fifteen billion rupiah. Meanwhile, bid prices with a value of less than 80% of the Owner Estimate (OE) continue to increase every year. Referring to the Regulations of the Government Goods/Services Procurement Policy Agency (LKPP), price fairness evaluation is only carried out for bids less than 80% of OE. This is interesting to study. The Sungai Pisang Suspension Bridge Construction Work, with an offer of 84.97% to the HPS, was used as the research sample. Data show that the tender winner resigned before the expiration of his bid guarantee period due to price increases which were influenced by global economic conditions. Based on an analysis of the main payment item (MPU), 3 items of work were found with bids of less than 80% of the OE, namely: (1) supply of steel piles, amounting to 76.81% of the OE, (2) supply of structural concrete Fc'25 MPa, of 72.34% of the OE, and (3) installation of steel frame bridges of 62.60% of the OE. This study shows that a bid of 84.97% of OE is declared unreasonable. In order to avoid similar risks, the reasonable price limit for small businesses in the Presidential Regulation derivative needs to be evaluated in a more comprehensive manner. \n  \nKeywords: small business; bid price limit; bid price; price fairness; main payment item \n  \nAbstrak \n  \nPeraturan Presiden Republik Indonesia Nomor 12 Tahun 2021 memuat kenaikan batasan pagu untuk pekerjaan kontruksi bagi usaha kecil menjadi lima belas milyar rupiah. Sementara itu, harga penawaran dengan nilai kurang dari 80% Harga Perkiraan Sendiri (HPS) terus meningkat setiap tahunnya. Mengacu Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP), evaluasi kewajaran harga hanya dilakukan untuk penawaran kurang dari 80% HPS. Hal ini menarik untuk dikaji. Pekerjaan Pembangunan Jembatan Gantung Sungai Pisang, dengan penawaran 84,97% terhadap HPS, digunakan sebagai sampel penelitian. Fakta menunjukkan bahwa pemenang tender mengundurkan diri sebelum habis masa jaminan penawarannya akibat kenaikan harga yang dipengaruh oleh kondisi ekonomi global. Berdasarkan analisis terhadap mata pembayaran utama (MPU), ditemukan 3 item pekerjaan dengan penawarannya kurang dari 80% HPS, yaitu: (1) penyediaan tiang pancang baja, sebesar 76,81% HPS, (2) penyediaan beton struktur Fc’25 MPa, sebesar 72,34% terhadap HPS, dan (3) pemasangan jembatan rangka baja sebesaar 62,60% HPS. Studi ini menunjukkan bahwa penawaran sebesar 84,97% HPS dinyatakan tidak wajar. Untuk menghindari risiko serupa, batas kewajaran harga untuk usaha kecil pada turunan Peraturan Presiden tersebut perlu dipertimbangkan lagi secara lebih komprehensif. \n  \nKata-kata kunci: usaha kecil; batasan pagu; harga penawaran; kewajaran harga; mata pembayaran utama","PeriodicalId":122843,"journal":{"name":"Jurnal HPJI","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"NILAI BATAS KEWAJARAN HARGA UNTUK TENDER PEKERJAAN KONTRUKSI KUALIFIKASI USAHA KECIL (STUDI KASUS PEMBANGUNAN JEMBATAN GANTUNG SUNGAI PISANG)\",\"authors\":\"A. Rusli\",\"doi\":\"10.26593/jhpji.v9i1.6436.17-26\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract \\n  \\nPresidential Regulation of the Republic of Indonesia Number 12 of 2021 contains an increase in the ceiling limit for construction work for small businesses to fifteen billion rupiah. Meanwhile, bid prices with a value of less than 80% of the Owner Estimate (OE) continue to increase every year. Referring to the Regulations of the Government Goods/Services Procurement Policy Agency (LKPP), price fairness evaluation is only carried out for bids less than 80% of OE. This is interesting to study. The Sungai Pisang Suspension Bridge Construction Work, with an offer of 84.97% to the HPS, was used as the research sample. Data show that the tender winner resigned before the expiration of his bid guarantee period due to price increases which were influenced by global economic conditions. Based on an analysis of the main payment item (MPU), 3 items of work were found with bids of less than 80% of the OE, namely: (1) supply of steel piles, amounting to 76.81% of the OE, (2) supply of structural concrete Fc'25 MPa, of 72.34% of the OE, and (3) installation of steel frame bridges of 62.60% of the OE. This study shows that a bid of 84.97% of OE is declared unreasonable. In order to avoid similar risks, the reasonable price limit for small businesses in the Presidential Regulation derivative needs to be evaluated in a more comprehensive manner. \\n  \\nKeywords: small business; bid price limit; bid price; price fairness; main payment item \\n  \\nAbstrak \\n  \\nPeraturan Presiden Republik Indonesia Nomor 12 Tahun 2021 memuat kenaikan batasan pagu untuk pekerjaan kontruksi bagi usaha kecil menjadi lima belas milyar rupiah. Sementara itu, harga penawaran dengan nilai kurang dari 80% Harga Perkiraan Sendiri (HPS) terus meningkat setiap tahunnya. Mengacu Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP), evaluasi kewajaran harga hanya dilakukan untuk penawaran kurang dari 80% HPS. Hal ini menarik untuk dikaji. Pekerjaan Pembangunan Jembatan Gantung Sungai Pisang, dengan penawaran 84,97% terhadap HPS, digunakan sebagai sampel penelitian. Fakta menunjukkan bahwa pemenang tender mengundurkan diri sebelum habis masa jaminan penawarannya akibat kenaikan harga yang dipengaruh oleh kondisi ekonomi global. Berdasarkan analisis terhadap mata pembayaran utama (MPU), ditemukan 3 item pekerjaan dengan penawarannya kurang dari 80% HPS, yaitu: (1) penyediaan tiang pancang baja, sebesar 76,81% HPS, (2) penyediaan beton struktur Fc’25 MPa, sebesar 72,34% terhadap HPS, dan (3) pemasangan jembatan rangka baja sebesaar 62,60% HPS. Studi ini menunjukkan bahwa penawaran sebesar 84,97% HPS dinyatakan tidak wajar. Untuk menghindari risiko serupa, batas kewajaran harga untuk usaha kecil pada turunan Peraturan Presiden tersebut perlu dipertimbangkan lagi secara lebih komprehensif. \\n  \\nKata-kata kunci: usaha kecil; batasan pagu; harga penawaran; kewajaran harga; mata pembayaran utama\",\"PeriodicalId\":122843,\"journal\":{\"name\":\"Jurnal HPJI\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal HPJI\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26593/jhpji.v9i1.6436.17-26\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal HPJI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26593/jhpji.v9i1.6436.17-26","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

印度尼西亚共和国2021年第12号总统条例将小企业建筑工程的最高限额提高到150亿印尼盾。与此同时,价值低于业主估价(OE) 80%的投标价格每年都在持续上涨。参考政府货物/服务采购政策机构(LKPP)的规定,价格公平性评估仅对OE低于80%的投标进行。这是很有趣的研究。以向HPS报价84.97%的双溪Pisang悬索桥建设工程为研究样本。数据显示,由于受全球经济状况影响,价格上涨,中标者在投标保修期届满前辞职。通过对主要付款项目(MPU)的分析,发现投标低于OE 80%的工程项目有3个,分别是:(1)供应钢桩,占OE的76.81%;(2)供应结构混凝土Fc’25 MPa,占OE的72.34%;(3)安装钢框架桥梁,占OE的62.60%。本研究表明,84.97%的OE报价是不合理的。为了避免类似的风险,需要对总统规制衍生品中小企业的合理限价进行更全面的评估。关键词:小企业;投标限价;投标价格;价格公平;主要付款项目摘要印度尼西亚总统共和国11月12日2021年1月1日备忘录kenaikan batasan pagu untuk pekerjaan kontruksi bagi usaha kecil menjadi lima belas军事印尼盾。Sementara itu, harga penawaran dengan nilai kurang dari 80% harga Perkiraan Sendiri (HPS) terus meningkat setiap tahunnya。Mengacu Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP),评估kewajaran harga hanya dilakukan untuk penawaran kurang dari 80% HPS。哈尔尼·梅纳里克·乌图克·迪卡吉。Pekerjaan Pembangunan Jembatan gantong Sungai Pisang, dengan penawaran 84,97% terhadap HPS, digunakan sebagai样品penelitian。Fakta menunjukkan bahwa pemenang tender mengundurkan diri sebelum habis masa jaminan penawarannya akibat kenaikan harga yang dipengaruh oleh kondisi经济全球。Berdasarkan分析terhadap mata pembayaran utama (MPU), ditemukan 3项pekerjaan dengan penawarannya kurang dari 80% HPS,结果:(1)penyediaan ang panang baja, sebesar 76,81% HPS, (2) penyediaan和beton构造Fc ' 25 MPa, sebesar 72,34% terhadap HPS,但(3)pemasangan jembatan rangka baja sebesaar 62,60% HPS。研究ini menunjukkan bahwa penawaran sebesar 84,97% HPS dinyatakan tidak wajar。吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛,吴登盛。武刀术;武刀术;薯瘟锡杀菌剂pagu;harga penawaran;kewajaran harga;Mata pembayaran utama
本文章由计算机程序翻译,如有差异,请以英文原文为准。
NILAI BATAS KEWAJARAN HARGA UNTUK TENDER PEKERJAAN KONTRUKSI KUALIFIKASI USAHA KECIL (STUDI KASUS PEMBANGUNAN JEMBATAN GANTUNG SUNGAI PISANG)
Abstract   Presidential Regulation of the Republic of Indonesia Number 12 of 2021 contains an increase in the ceiling limit for construction work for small businesses to fifteen billion rupiah. Meanwhile, bid prices with a value of less than 80% of the Owner Estimate (OE) continue to increase every year. Referring to the Regulations of the Government Goods/Services Procurement Policy Agency (LKPP), price fairness evaluation is only carried out for bids less than 80% of OE. This is interesting to study. The Sungai Pisang Suspension Bridge Construction Work, with an offer of 84.97% to the HPS, was used as the research sample. Data show that the tender winner resigned before the expiration of his bid guarantee period due to price increases which were influenced by global economic conditions. Based on an analysis of the main payment item (MPU), 3 items of work were found with bids of less than 80% of the OE, namely: (1) supply of steel piles, amounting to 76.81% of the OE, (2) supply of structural concrete Fc'25 MPa, of 72.34% of the OE, and (3) installation of steel frame bridges of 62.60% of the OE. This study shows that a bid of 84.97% of OE is declared unreasonable. In order to avoid similar risks, the reasonable price limit for small businesses in the Presidential Regulation derivative needs to be evaluated in a more comprehensive manner.   Keywords: small business; bid price limit; bid price; price fairness; main payment item   Abstrak   Peraturan Presiden Republik Indonesia Nomor 12 Tahun 2021 memuat kenaikan batasan pagu untuk pekerjaan kontruksi bagi usaha kecil menjadi lima belas milyar rupiah. Sementara itu, harga penawaran dengan nilai kurang dari 80% Harga Perkiraan Sendiri (HPS) terus meningkat setiap tahunnya. Mengacu Peraturan Lembaga Kebijakan Pengadaan Barang/Jasa Pemerintah (LKPP), evaluasi kewajaran harga hanya dilakukan untuk penawaran kurang dari 80% HPS. Hal ini menarik untuk dikaji. Pekerjaan Pembangunan Jembatan Gantung Sungai Pisang, dengan penawaran 84,97% terhadap HPS, digunakan sebagai sampel penelitian. Fakta menunjukkan bahwa pemenang tender mengundurkan diri sebelum habis masa jaminan penawarannya akibat kenaikan harga yang dipengaruh oleh kondisi ekonomi global. Berdasarkan analisis terhadap mata pembayaran utama (MPU), ditemukan 3 item pekerjaan dengan penawarannya kurang dari 80% HPS, yaitu: (1) penyediaan tiang pancang baja, sebesar 76,81% HPS, (2) penyediaan beton struktur Fc’25 MPa, sebesar 72,34% terhadap HPS, dan (3) pemasangan jembatan rangka baja sebesaar 62,60% HPS. Studi ini menunjukkan bahwa penawaran sebesar 84,97% HPS dinyatakan tidak wajar. Untuk menghindari risiko serupa, batas kewajaran harga untuk usaha kecil pada turunan Peraturan Presiden tersebut perlu dipertimbangkan lagi secara lebih komprehensif.   Kata-kata kunci: usaha kecil; batasan pagu; harga penawaran; kewajaran harga; mata pembayaran utama
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信