{"title":"分配NASA地面系统的可靠性和可维护性目标","authors":"A. M. Gillespie, M. W. Monaghan","doi":"10.1109/RAMS.2013.6517683","DOIUrl":null,"url":null,"abstract":"A Reliability, Maintainability, and Availability (RMA) analysis team, supported by the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) Program, developed an RMA allocation and analysis process utilizing standard Reliability and Maintainability (R&M) allocation techniques, along with system-based knowledge, to ensure the GSDO subsystems (SS) achieve the required launch availability goal. In this paper, we will present an effective way to allocate RMA requirements that are Specific, Measureable, Attainable, Realistic, and Time-bound (SMART) [1].","PeriodicalId":189714,"journal":{"name":"2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS)","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Allocating reliability & maintainability goals to NASA ground systems\",\"authors\":\"A. M. Gillespie, M. W. Monaghan\",\"doi\":\"10.1109/RAMS.2013.6517683\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A Reliability, Maintainability, and Availability (RMA) analysis team, supported by the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) Program, developed an RMA allocation and analysis process utilizing standard Reliability and Maintainability (R&M) allocation techniques, along with system-based knowledge, to ensure the GSDO subsystems (SS) achieve the required launch availability goal. In this paper, we will present an effective way to allocate RMA requirements that are Specific, Measureable, Attainable, Realistic, and Time-bound (SMART) [1].\",\"PeriodicalId\":189714,\"journal\":{\"name\":\"2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS)\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-05-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RAMS.2013.6517683\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2013.6517683","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Allocating reliability & maintainability goals to NASA ground systems
A Reliability, Maintainability, and Availability (RMA) analysis team, supported by the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) Ground Systems Development and Operations (GSDO) Program, developed an RMA allocation and analysis process utilizing standard Reliability and Maintainability (R&M) allocation techniques, along with system-based knowledge, to ensure the GSDO subsystems (SS) achieve the required launch availability goal. In this paper, we will present an effective way to allocate RMA requirements that are Specific, Measureable, Attainable, Realistic, and Time-bound (SMART) [1].