{"title":"数据中心运维的人因心理学","authors":"M. Wiboonrat","doi":"10.1109/ICIM49319.2020.244692","DOIUrl":null,"url":null,"abstract":"The human factor psychology are phenomenally adjust at identifying biases, errors, failures, defects, and deficiencies in how other people in the team think. The Institute Abnormal Incident Reports (AIRs) database reveals that approximately 70 percent of the reported data center outages are directly involved with human error. This paper has been investigated on 2 case studies, the case of data center failure of British Airways in May 2017, and data center assessment of two commercial banks in Bangkok Thailand. Data center outage according to operations and maintenance had been investigated subject to human factors much related to data center outages rather than systems failure. This paper proposes a personal certificated standard, an umbrella team structure, and data center infrastructure management (DCIM) to eliminate human error from data center operations and maintenance.","PeriodicalId":129517,"journal":{"name":"2020 6th International Conference on Information Management (ICIM)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Human Factors Psychology of Data Center Operations and Maintenance\",\"authors\":\"M. Wiboonrat\",\"doi\":\"10.1109/ICIM49319.2020.244692\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The human factor psychology are phenomenally adjust at identifying biases, errors, failures, defects, and deficiencies in how other people in the team think. The Institute Abnormal Incident Reports (AIRs) database reveals that approximately 70 percent of the reported data center outages are directly involved with human error. This paper has been investigated on 2 case studies, the case of data center failure of British Airways in May 2017, and data center assessment of two commercial banks in Bangkok Thailand. Data center outage according to operations and maintenance had been investigated subject to human factors much related to data center outages rather than systems failure. This paper proposes a personal certificated standard, an umbrella team structure, and data center infrastructure management (DCIM) to eliminate human error from data center operations and maintenance.\",\"PeriodicalId\":129517,\"journal\":{\"name\":\"2020 6th International Conference on Information Management (ICIM)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-03-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 6th International Conference on Information Management (ICIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICIM49319.2020.244692\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th International Conference on Information Management (ICIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICIM49319.2020.244692","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

人因心理学在识别团队中其他人的偏见、错误、失败、缺陷和不足方面具有显著的适应性。Institute异常事件报告(AIRs)数据库显示,大约70%报告的数据中心中断与人为错误直接相关。本文研究了2个案例,分别是2017年5月英国航空公司数据中心故障案例和泰国曼谷两家商业银行数据中心评估案例。根据操作和维护对数据中心中断进行了调查,并受到与数据中心中断密切相关的人为因素的影响,而不是系统故障。本文提出了个人认证标准、伞形团队结构和数据中心基础设施管理(DCIM),以消除数据中心操作和维护中的人为错误。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Human Factors Psychology of Data Center Operations and Maintenance
The human factor psychology are phenomenally adjust at identifying biases, errors, failures, defects, and deficiencies in how other people in the team think. The Institute Abnormal Incident Reports (AIRs) database reveals that approximately 70 percent of the reported data center outages are directly involved with human error. This paper has been investigated on 2 case studies, the case of data center failure of British Airways in May 2017, and data center assessment of two commercial banks in Bangkok Thailand. Data center outage according to operations and maintenance had been investigated subject to human factors much related to data center outages rather than systems failure. This paper proposes a personal certificated standard, an umbrella team structure, and data center infrastructure management (DCIM) to eliminate human error from data center operations and maintenance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信