{"title":"利用Simulink和单个PC机对小型配电馈线进行实时仿真","authors":"F. Uriarte, K. Butler-Purry","doi":"10.1109/NAPS.2005.1560527","DOIUrl":null,"url":null,"abstract":"This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.","PeriodicalId":101495,"journal":{"name":"Proceedings of the 37th Annual North American Power Symposium, 2005.","volume":"81 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-12-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Real-time simulation of a small-scale distribution feeder using Simulink and a single PC\",\"authors\":\"F. Uriarte, K. Butler-Purry\",\"doi\":\"10.1109/NAPS.2005.1560527\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.\",\"PeriodicalId\":101495,\"journal\":{\"name\":\"Proceedings of the 37th Annual North American Power Symposium, 2005.\",\"volume\":\"81 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-12-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 37th Annual North American Power Symposium, 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/NAPS.2005.1560527\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 37th Annual North American Power Symposium, 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/NAPS.2005.1560527","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

这项工作记录的含义,方法和结果建模的电力系统在实时使用单个PC机;离线和实时结果同时呈现。众所周知,一台运行Windows的PC无法保证实时性能,特别是对于高阶系统。尽管如此,使用建议的优化可以在同一台计算机上实现实时模拟时间。该系统是一个三相径向系统,由断路器、自耦变压器、两条并联传输线、可切换负载和感应电动机组成。在单机样机实时车间提供的目标中,采用了通用实时目标(GRT)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Real-time simulation of a small-scale distribution feeder using Simulink and a single PC
This work documents the implications, methodology, and results of modeling a power system in real-time using a single PC; offline and real-time results are both presented. It is known that a single PC running Windows cannot guarantee real-time performance, especially for higher order systems. Nonetheless, using the suggested optimizations real-time simulation times are achieved on a same computer. The system modeled is a three-phase radial system consisting of breakers, an autotransformer, two parallel transmission lines, switchable loads, and an induction motor. Among the targets provided by the real-time workshop for single PC prototyping, the generic real-time target (GRT) was used.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信