{"title":"风电机组最大功率点运行时间框架缩减","authors":"C. Chioncel, E. Spunei, Anamaria-Cătălina Nițu, N. Gillich, G. Tirian","doi":"10.1109/ISFEE51261.2020.9756171","DOIUrl":null,"url":null,"abstract":"The paper proposes to identify the necessary steps, reflected then in a method, through which the necessary time required to bring the wind turbine to operate in the maximum power point is minimized. For this, in time, several recordings are done, and sizes computed: wind velocity, electric generator power, mechanical angular speed considering, optimum mechanical angular speed–based on the dependence between mechanical angular speed and wind speed. The minimization of the time interval necessary to bring the rpm of the electric generator to the optimal value, is based on the involvement of the maximum value for the electric generator current.","PeriodicalId":145923,"journal":{"name":"2020 International Symposium on Fundamentals of Electrical Engineering (ISFEE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Time Frame Reduction for Maximum Power Point Operation of Wind Turbines\",\"authors\":\"C. Chioncel, E. Spunei, Anamaria-Cătălina Nițu, N. Gillich, G. Tirian\",\"doi\":\"10.1109/ISFEE51261.2020.9756171\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper proposes to identify the necessary steps, reflected then in a method, through which the necessary time required to bring the wind turbine to operate in the maximum power point is minimized. For this, in time, several recordings are done, and sizes computed: wind velocity, electric generator power, mechanical angular speed considering, optimum mechanical angular speed–based on the dependence between mechanical angular speed and wind speed. The minimization of the time interval necessary to bring the rpm of the electric generator to the optimal value, is based on the involvement of the maximum value for the electric generator current.\",\"PeriodicalId\":145923,\"journal\":{\"name\":\"2020 International Symposium on Fundamentals of Electrical Engineering (ISFEE)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 International Symposium on Fundamentals of Electrical Engineering (ISFEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISFEE51261.2020.9756171\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Symposium on Fundamentals of Electrical Engineering (ISFEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISFEE51261.2020.9756171","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文提出确定必要的步骤,并将其反映在一种方法中,通过该方法使风力发电机在最大功率点运行所需的必要时间最小化。为此,及时进行多次记录,并计算大小:风速,发电机功率,考虑机械角速度,基于机械角速度和风速之间的依赖关系的最佳机械角速度。使发电机的转速达到最佳值所需的时间间隔的最小化,是基于发电机电流最大值的参与。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Time Frame Reduction for Maximum Power Point Operation of Wind Turbines
The paper proposes to identify the necessary steps, reflected then in a method, through which the necessary time required to bring the wind turbine to operate in the maximum power point is minimized. For this, in time, several recordings are done, and sizes computed: wind velocity, electric generator power, mechanical angular speed considering, optimum mechanical angular speed–based on the dependence between mechanical angular speed and wind speed. The minimization of the time interval necessary to bring the rpm of the electric generator to the optimal value, is based on the involvement of the maximum value for the electric generator current.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信