大吨位大悬架角预扭悬架钳的优化设计

Xinqian Xu, Yong Chen, Zhangxuan Wang, Xinyu Zhao, Li Gu, Zuoxin Chen, Rui Zhou
{"title":"大吨位大悬架角预扭悬架钳的优化设计","authors":"Xinqian Xu, Yong Chen, Zhangxuan Wang, Xinyu Zhao, Li Gu, Zuoxin Chen, Rui Zhou","doi":"10.1109/ICSCDE54196.2021.00059","DOIUrl":null,"url":null,"abstract":"In order to improve the performance of pre-twisted suspension clamp with large tonnage and large suspension angle, an optimal design method of large tonnage and large suspension angle pre-twisted suspension clamp is proposed. Firstly, three-dimensional software is used to build the model, and then, finite element software is used to simulate stress analysis and structure optimization. Finally, taking the 500kv Yangtze River crossing project from Fengcheng to Meili as an example, the opgw-350 large tonnage pre-twisted double suspension clamp with large suspension angle is developed. The experimental results show that the pre-twisted suspension clamp with large tonnage and large suspension angle can meet the engineering requirements.","PeriodicalId":208108,"journal":{"name":"2021 International Conference of Social Computing and Digital Economy (ICSCDE)","volume":"75 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization design of Pre-twisted Suspension Clamp with Large Tonnage and Large Suspension Angle\",\"authors\":\"Xinqian Xu, Yong Chen, Zhangxuan Wang, Xinyu Zhao, Li Gu, Zuoxin Chen, Rui Zhou\",\"doi\":\"10.1109/ICSCDE54196.2021.00059\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In order to improve the performance of pre-twisted suspension clamp with large tonnage and large suspension angle, an optimal design method of large tonnage and large suspension angle pre-twisted suspension clamp is proposed. Firstly, three-dimensional software is used to build the model, and then, finite element software is used to simulate stress analysis and structure optimization. Finally, taking the 500kv Yangtze River crossing project from Fengcheng to Meili as an example, the opgw-350 large tonnage pre-twisted double suspension clamp with large suspension angle is developed. The experimental results show that the pre-twisted suspension clamp with large tonnage and large suspension angle can meet the engineering requirements.\",\"PeriodicalId\":208108,\"journal\":{\"name\":\"2021 International Conference of Social Computing and Digital Economy (ICSCDE)\",\"volume\":\"75 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 International Conference of Social Computing and Digital Economy (ICSCDE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSCDE54196.2021.00059\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference of Social Computing and Digital Economy (ICSCDE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSCDE54196.2021.00059","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

为了提高大吨位大悬挂角预扭悬挂钳的性能,提出了一种大吨位大悬挂角预扭悬挂钳的优化设计方法。首先利用三维软件建立模型,然后利用有限元软件进行模拟应力分析和结构优化。最后,以丰城至梅里500kv长江穿越工程为例,研制了opgw-350大吨位预扭大悬角双悬夹。试验结果表明,大吨位、大悬挂角的预扭悬架夹具能够满足工程要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization design of Pre-twisted Suspension Clamp with Large Tonnage and Large Suspension Angle
In order to improve the performance of pre-twisted suspension clamp with large tonnage and large suspension angle, an optimal design method of large tonnage and large suspension angle pre-twisted suspension clamp is proposed. Firstly, three-dimensional software is used to build the model, and then, finite element software is used to simulate stress analysis and structure optimization. Finally, taking the 500kv Yangtze River crossing project from Fengcheng to Meili as an example, the opgw-350 large tonnage pre-twisted double suspension clamp with large suspension angle is developed. The experimental results show that the pre-twisted suspension clamp with large tonnage and large suspension angle can meet the engineering requirements.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信