运用TPM方法提高转炉的生产效率

E. Michlowicz, Tomasz Korfel
{"title":"运用TPM方法提高转炉的生产效率","authors":"E. Michlowicz, Tomasz Korfel","doi":"10.37904/metal.2021.4293","DOIUrl":null,"url":null,"abstract":"Zinc oxide concentrate production from industrial waste is performed in the so-called rolldown process – in rotary furnaces. It is a complex technological process. Incorrect process execution will cause a large number of unplanned stops that significantly affect production. The purpose of the work was to analyze upgrade of technological lines used for the production of zinc oxide concentrate at B. Recycling company. The detailed purposes of the study included the analysis of fault time, standstill of the planned technological lines no. 1 and 6 for processing of steel fly ashes, and line no. 2 for processing of zinc-bearing sludges. In the study the Total Productive Maintenance method elements was used. The histograms for planned downtime and failures of individual technological lines for a period of one year were developed and the MTTF, MTBF and OEE indices for three production lines were set. The results were analyzed. A solution was proposed to shorten the failure time of the above mentioned technological lines.","PeriodicalId":266696,"journal":{"name":"METAL 2021 Conference Proeedings","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"IMPROVING THE PRODUCTIVITY OF OPERATION OF ROTARY FURNACES USING THE TPM METHOD\",\"authors\":\"E. Michlowicz, Tomasz Korfel\",\"doi\":\"10.37904/metal.2021.4293\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Zinc oxide concentrate production from industrial waste is performed in the so-called rolldown process – in rotary furnaces. It is a complex technological process. Incorrect process execution will cause a large number of unplanned stops that significantly affect production. The purpose of the work was to analyze upgrade of technological lines used for the production of zinc oxide concentrate at B. Recycling company. The detailed purposes of the study included the analysis of fault time, standstill of the planned technological lines no. 1 and 6 for processing of steel fly ashes, and line no. 2 for processing of zinc-bearing sludges. In the study the Total Productive Maintenance method elements was used. The histograms for planned downtime and failures of individual technological lines for a period of one year were developed and the MTTF, MTBF and OEE indices for three production lines were set. The results were analyzed. A solution was proposed to shorten the failure time of the above mentioned technological lines.\",\"PeriodicalId\":266696,\"journal\":{\"name\":\"METAL 2021 Conference Proeedings\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"METAL 2021 Conference Proeedings\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37904/metal.2021.4293\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"METAL 2021 Conference Proeedings","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37904/metal.2021.4293","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

从工业废料中生产氧化锌精矿是在所谓的滚压过程中进行的-在旋转炉中。这是一个复杂的技术过程。错误的流程执行将导致大量计划外停机,严重影响生产。本研究的目的是分析b回收公司氧化锌精矿生产工艺线的改造。详细的研究目的包括故障时间分析,计划的工艺线的停顿。1、6号线用于处理钢飞灰;2用于处理含锌污泥。在研究中,采用了全面生产性维修方法。建立了一年内各工艺线的计划停机时间和故障直方图,并设置了三条生产线的MTTF、MTBF和OEE指标。对结果进行分析。提出了缩短上述工艺线失效时间的解决方案。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
IMPROVING THE PRODUCTIVITY OF OPERATION OF ROTARY FURNACES USING THE TPM METHOD
Zinc oxide concentrate production from industrial waste is performed in the so-called rolldown process – in rotary furnaces. It is a complex technological process. Incorrect process execution will cause a large number of unplanned stops that significantly affect production. The purpose of the work was to analyze upgrade of technological lines used for the production of zinc oxide concentrate at B. Recycling company. The detailed purposes of the study included the analysis of fault time, standstill of the planned technological lines no. 1 and 6 for processing of steel fly ashes, and line no. 2 for processing of zinc-bearing sludges. In the study the Total Productive Maintenance method elements was used. The histograms for planned downtime and failures of individual technological lines for a period of one year were developed and the MTTF, MTBF and OEE indices for three production lines were set. The results were analyzed. A solution was proposed to shorten the failure time of the above mentioned technological lines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信