H. Harbaoui, Soulef Khalfallah, O. Bellenguez-Morineau
{"title":"无等待和有限空闲时间的混合流程车间的案例研究,以最大限度地减少材料浪费","authors":"H. Harbaoui, Soulef Khalfallah, O. Bellenguez-Morineau","doi":"10.1109/SISY.2017.8080554","DOIUrl":null,"url":null,"abstract":"This paper deals with a new configuration of scheduling problem inspired from a real industrial case which is pasta production. It could be defined as maximal-idle time (limited idle time) and no-wait hybrid flow shop with dedicated machines. Machines on the first stage have a limited idle time interval constraint. To the best of our knowledge, this is the first paper to study constraint of maximal idle time simultaneously with machine set-up for hybrid flow shop problems. The objective is to minimize waste of materials due to machine idle time exceeding α unit. Two mixed integer linear programming models (MIP) with two different objectives are proposed. Using numerical experiments, we compare the results of the first MIP according to makespan minimization and waste minimization.","PeriodicalId":352891,"journal":{"name":"2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste\",\"authors\":\"H. Harbaoui, Soulef Khalfallah, O. Bellenguez-Morineau\",\"doi\":\"10.1109/SISY.2017.8080554\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper deals with a new configuration of scheduling problem inspired from a real industrial case which is pasta production. It could be defined as maximal-idle time (limited idle time) and no-wait hybrid flow shop with dedicated machines. Machines on the first stage have a limited idle time interval constraint. To the best of our knowledge, this is the first paper to study constraint of maximal idle time simultaneously with machine set-up for hybrid flow shop problems. The objective is to minimize waste of materials due to machine idle time exceeding α unit. Two mixed integer linear programming models (MIP) with two different objectives are proposed. Using numerical experiments, we compare the results of the first MIP according to makespan minimization and waste minimization.\",\"PeriodicalId\":352891,\"journal\":{\"name\":\"2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY)\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SISY.2017.8080554\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SISY.2017.8080554","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste
This paper deals with a new configuration of scheduling problem inspired from a real industrial case which is pasta production. It could be defined as maximal-idle time (limited idle time) and no-wait hybrid flow shop with dedicated machines. Machines on the first stage have a limited idle time interval constraint. To the best of our knowledge, this is the first paper to study constraint of maximal idle time simultaneously with machine set-up for hybrid flow shop problems. The objective is to minimize waste of materials due to machine idle time exceeding α unit. Two mixed integer linear programming models (MIP) with two different objectives are proposed. Using numerical experiments, we compare the results of the first MIP according to makespan minimization and waste minimization.