不可再生资源约束下流水车间生产与维修调度优化的多目标方法

Radhwan Boufellouh, F. Belkaid
{"title":"不可再生资源约束下流水车间生产与维修调度优化的多目标方法","authors":"Radhwan Boufellouh, F. Belkaid","doi":"10.1109/ICAEE47123.2019.9014781","DOIUrl":null,"url":null,"abstract":"Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.","PeriodicalId":197612,"journal":{"name":"2019 International Conference on Advanced Electrical Engineering (ICAEE)","volume":"1 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multi-objective approach to optimize production and maintenance scheduling in flow shop environment under non-renewable resources constraints\",\"authors\":\"Radhwan Boufellouh, F. Belkaid\",\"doi\":\"10.1109/ICAEE47123.2019.9014781\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.\",\"PeriodicalId\":197612,\"journal\":{\"name\":\"2019 International Conference on Advanced Electrical Engineering (ICAEE)\",\"volume\":\"1 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Conference on Advanced Electrical Engineering (ICAEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICAEE47123.2019.9014781\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Advanced Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE47123.2019.9014781","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

传统的调度问题将机器作为执行生产任务所需的唯一资源。实际上,其他类型的资源,如原材料、工具、化学成分等。通常会对许多实际应用程序的生产产生很大的影响。此外,维修服务也涉及到制造过程;他们的目标是维持生产系统并保持机器处于健康的运行状态。本文研究了在系统外部供应有限且数量确定的情况下,双目标置换流程车间调度和维修计划问题。采用著名的第二版非支配排序遗传算法(NSGA-II)来处理该问题,并在合理的时间内获得近似的非支配集。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Multi-objective approach to optimize production and maintenance scheduling in flow shop environment under non-renewable resources constraints
Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信