{"title":"不可再生资源约束下流水车间生产与维修调度优化的多目标方法","authors":"Radhwan Boufellouh, F. Belkaid","doi":"10.1109/ICAEE47123.2019.9014781","DOIUrl":null,"url":null,"abstract":"Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.","PeriodicalId":197612,"journal":{"name":"2019 International Conference on Advanced Electrical Engineering (ICAEE)","volume":"1 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Multi-objective approach to optimize production and maintenance scheduling in flow shop environment under non-renewable resources constraints\",\"authors\":\"Radhwan Boufellouh, F. Belkaid\",\"doi\":\"10.1109/ICAEE47123.2019.9014781\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.\",\"PeriodicalId\":197612,\"journal\":{\"name\":\"2019 International Conference on Advanced Electrical Engineering (ICAEE)\",\"volume\":\"1 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 International Conference on Advanced Electrical Engineering (ICAEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICAEE47123.2019.9014781\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Advanced Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE47123.2019.9014781","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Multi-objective approach to optimize production and maintenance scheduling in flow shop environment under non-renewable resources constraints
Traditional scheduling problems deal with machines as the only type of resource needed to conduct production tasks. In reality, other types of resources such as raw materials, tools, chemical ingredients …etc. often have a great impact on production in many real-world applications. In addition, maintenance services are also implicated in the manufacturing process; their goal is to sustain the production system and keep the machines in healthy operating conditions. This paper deals with a bi-objective permutation flowshop scheduling, and maintenance planning problem subject to limited non-renewable resources supplied from outside the system with deterministic quantities at predetermined moments. The well-known Second version of the Non Dominated Sorting Genetic Algorithm (NSGA-II) is adopted to deal with the problem and obtain approximate non-dominated sets in reasonable time.