{"title":"基于风险的高层建筑工程设计-施工一体化设计与施工阶段工作分解结构(WBS)标准的制定,以提高建筑安全性能","authors":"Gabby Andina Ganesdhi, Y. Latief, Danang Budi Nugroho","doi":"10.46729/ijstm.v4i4.896","DOIUrl":null,"url":null,"abstract":"Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessment. The output in this research is a development of risk-based standard work breakdown structure for architectural work, which generated from 39 high level risk. Based on the results of the mapping of preventive and corrective actions at high-level risks, 5 types of WBS development can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of risk so that safety performance could be improved. The novelty in this research lies in the form of design-build project delivery activities which has not been widely discussed in previous work breakdown structure research and risk identification based on the activities listed on the WBS.","PeriodicalId":384527,"journal":{"name":"International Journal of Science, Technology & Management","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance\",\"authors\":\"Gabby Andina Ganesdhi, Y. Latief, Danang Budi Nugroho\",\"doi\":\"10.46729/ijstm.v4i4.896\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessment. The output in this research is a development of risk-based standard work breakdown structure for architectural work, which generated from 39 high level risk. Based on the results of the mapping of preventive and corrective actions at high-level risks, 5 types of WBS development can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of risk so that safety performance could be improved. The novelty in this research lies in the form of design-build project delivery activities which has not been widely discussed in previous work breakdown structure research and risk identification based on the activities listed on the WBS.\",\"PeriodicalId\":384527,\"journal\":{\"name\":\"International Journal of Science, Technology & Management\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Science, Technology & Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.46729/ijstm.v4i4.896\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Science, Technology & Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46729/ijstm.v4i4.896","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Development Of Risk-Based Work Breakdown Structure (WBS) Standards For Integrated Design And Construction Phase On Design-Build Method Of Architectural Works Of High-Rise Building To Improve Construction Safety Performance
Design-build methods are one of the options in carrying out the construction of high-rise buildings with a high level of uncertainty from design phase to construction, which also affects the safety performance of the project itself. Therefore, a prevention standard for a high-risk event is needed based on project activities. This research was prepared using a descriptive qualitative method with expert validation process through Delphi method and completed with a questionnaire survey to conduct a risk assessment. The output in this research is a development of risk-based standard work breakdown structure for architectural work, which generated from 39 high level risk. Based on the results of the mapping of preventive and corrective actions at high-level risks, 5 types of WBS development can be carried out at levels 3 to 6 of the WBS to prevent and minimize the impact of risk so that safety performance could be improved. The novelty in this research lies in the form of design-build project delivery activities which has not been widely discussed in previous work breakdown structure research and risk identification based on the activities listed on the WBS.