{"title":"石油勘探项目中解释结构建模与期望值法相结合的项目风险管理方法","authors":"D. Sarkar, S. Yadav","doi":"10.1504/IJDSRM.2013.057537","DOIUrl":null,"url":null,"abstract":"Oil exploration projects involve a large number of vulnerabilities and uncertainties associated with all project phases. This paper aims to develop a comprehensive framework for project risk management based on combined interpretive structural modelling (ISM) and expected value method (EVM) approach for oil exploration projects. ISM is useful in categorising the risks into different levels depending upon their severity and also in identifying the presence or absence of an interaction between risky activities. By EVM analysis, it is observed that the expected time overrun and expected cost overrun is about 15% and 20.08% more than the base time estimate (BTE) and base cost estimate (BCE) respectively. It is also observed that the probability of successful completion of the project within the scheduled contractual duration is only 10.75%. Thus, to ensure the probability of successful completion of the project, risk mitigation measures should be adopted accordingly.","PeriodicalId":170104,"journal":{"name":"International Journal of Decision Sciences, Risk and Management","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-11-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Combined interpretive structural modelling and expected value method approach for managing project risks in oil exploration project\",\"authors\":\"D. Sarkar, S. Yadav\",\"doi\":\"10.1504/IJDSRM.2013.057537\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Oil exploration projects involve a large number of vulnerabilities and uncertainties associated with all project phases. This paper aims to develop a comprehensive framework for project risk management based on combined interpretive structural modelling (ISM) and expected value method (EVM) approach for oil exploration projects. ISM is useful in categorising the risks into different levels depending upon their severity and also in identifying the presence or absence of an interaction between risky activities. By EVM analysis, it is observed that the expected time overrun and expected cost overrun is about 15% and 20.08% more than the base time estimate (BTE) and base cost estimate (BCE) respectively. It is also observed that the probability of successful completion of the project within the scheduled contractual duration is only 10.75%. Thus, to ensure the probability of successful completion of the project, risk mitigation measures should be adopted accordingly.\",\"PeriodicalId\":170104,\"journal\":{\"name\":\"International Journal of Decision Sciences, Risk and Management\",\"volume\":\"5 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-11-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Decision Sciences, Risk and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJDSRM.2013.057537\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Decision Sciences, Risk and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJDSRM.2013.057537","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

石油勘探项目涉及到与项目各个阶段相关的大量脆弱性和不确定性。基于解释结构建模(ISM)和期望值法(EVM)相结合的方法,建立了石油勘探项目风险管理的综合框架。ISM可以根据风险的严重程度将风险分类为不同的级别,还可以识别风险活动之间是否存在相互作用。通过EVM分析发现,预期时间超支和预期成本超支分别比基本时间估计(BTE)和基本成本估计(BCE)高约15%和20.08%。还可以观察到,在预定合同期限内成功完成项目的概率仅为10.75%。因此,为确保项目成功完成的概率,应采取相应的风险缓解措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Combined interpretive structural modelling and expected value method approach for managing project risks in oil exploration project
Oil exploration projects involve a large number of vulnerabilities and uncertainties associated with all project phases. This paper aims to develop a comprehensive framework for project risk management based on combined interpretive structural modelling (ISM) and expected value method (EVM) approach for oil exploration projects. ISM is useful in categorising the risks into different levels depending upon their severity and also in identifying the presence or absence of an interaction between risky activities. By EVM analysis, it is observed that the expected time overrun and expected cost overrun is about 15% and 20.08% more than the base time estimate (BTE) and base cost estimate (BCE) respectively. It is also observed that the probability of successful completion of the project within the scheduled contractual duration is only 10.75%. Thus, to ensure the probability of successful completion of the project, risk mitigation measures should be adopted accordingly.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信