{"title":"印尼西爪哇Baiturrahman寄宿学校沼气发电系统的沼气池机组性能","authors":"A. Wresta, Henny Sudibyo, D. Andriani","doi":"10.1109/ICSEEA.2017.8267688","DOIUrl":null,"url":null,"abstract":"Study concerning the digester unit of biogas power system at Baiturrahman Boarding School is highly needed to understand the performance and function of each digester in producing biogas. There are six digesters, named as Digester 1, Digester 2, Digester 3, Digester 4, Digester 5, and Digester 6. However, Digester 2 which was purposed for food waste feed has not been operated. The fifth functioning digesters are operated with cow manure and human faeces as raw materials. This research was conducted by analyzing the process parameters, i.e., TS concentration, VFA concentration, slurry pH and thickness, and methane content of biogas produced. The result showed that based on feeding rate of cow manure and human faeces, the retention times of the slurry were significantly longer, more than 25 days for each digester and more than 100 days after the total process in all digesters. This long retention time implied the complete process after two series step in Digester 1, Digester 3, and Digester 4, that was identified by the fact that the degradation process in Digester 5 and Digester 6 did not significantly decrease TS and VFA concentrations. The methane content obtained was lower than previously researches, this might cause due to air entrainment that happens in biogas compression process. It can be concluded that many serial digesters (more than 2) are not necessarily needed if the retention time of the slurry in each digester had been significantly longer.","PeriodicalId":297700,"journal":{"name":"2017 International Conference on Sustainable Energy Engineering and Application (ICSEEA)","volume":"96 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Digester unit performance of biogas power system at Baiturrahman Boarding School, West Java, Indonesia\",\"authors\":\"A. Wresta, Henny Sudibyo, D. Andriani\",\"doi\":\"10.1109/ICSEEA.2017.8267688\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Study concerning the digester unit of biogas power system at Baiturrahman Boarding School is highly needed to understand the performance and function of each digester in producing biogas. There are six digesters, named as Digester 1, Digester 2, Digester 3, Digester 4, Digester 5, and Digester 6. However, Digester 2 which was purposed for food waste feed has not been operated. The fifth functioning digesters are operated with cow manure and human faeces as raw materials. This research was conducted by analyzing the process parameters, i.e., TS concentration, VFA concentration, slurry pH and thickness, and methane content of biogas produced. The result showed that based on feeding rate of cow manure and human faeces, the retention times of the slurry were significantly longer, more than 25 days for each digester and more than 100 days after the total process in all digesters. This long retention time implied the complete process after two series step in Digester 1, Digester 3, and Digester 4, that was identified by the fact that the degradation process in Digester 5 and Digester 6 did not significantly decrease TS and VFA concentrations. The methane content obtained was lower than previously researches, this might cause due to air entrainment that happens in biogas compression process. It can be concluded that many serial digesters (more than 2) are not necessarily needed if the retention time of the slurry in each digester had been significantly longer.\",\"PeriodicalId\":297700,\"journal\":{\"name\":\"2017 International Conference on Sustainable Energy Engineering and Application (ICSEEA)\",\"volume\":\"96 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 International Conference on Sustainable Energy Engineering and Application (ICSEEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICSEEA.2017.8267688\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 International Conference on Sustainable Energy Engineering and Application (ICSEEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSEEA.2017.8267688","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

baiiturrahman寄宿学校沼气发电系统沼气池单元的研究非常有必要,以了解每个沼气池在生产沼气中的性能和功能。共有六个消化器,分别命名为消化器1、消化器2、消化器3、消化器4、消化器5和消化器6。然而,用于处理食物垃圾饲料的2号消化池尚未运行。第五个功能消化器以牛粪和人粪为原料。本研究通过分析工艺参数,即TS浓度、VFA浓度、浆液pH和厚度、沼气含量进行研究。结果表明,以牛粪和人粪饲喂率为基准,料浆停留时间明显延长,每个消化池停留时间均在25 d以上,所有消化池停留时间均在100 d以上。这一较长的停留时间意味着在消化池1、消化池3和消化池4经过两个系列步骤后的过程是完整的,这可以通过消化池5和消化池6的降解过程没有显著降低TS和VFA浓度来确定。得到的甲烷含量低于以往的研究,这可能是由于沼气压缩过程中夹带空气造成的。可以得出结论,如果浆液在每个蒸煮池中的停留时间明显延长,则不一定需要多个串联蒸煮池(2个以上)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Digester unit performance of biogas power system at Baiturrahman Boarding School, West Java, Indonesia
Study concerning the digester unit of biogas power system at Baiturrahman Boarding School is highly needed to understand the performance and function of each digester in producing biogas. There are six digesters, named as Digester 1, Digester 2, Digester 3, Digester 4, Digester 5, and Digester 6. However, Digester 2 which was purposed for food waste feed has not been operated. The fifth functioning digesters are operated with cow manure and human faeces as raw materials. This research was conducted by analyzing the process parameters, i.e., TS concentration, VFA concentration, slurry pH and thickness, and methane content of biogas produced. The result showed that based on feeding rate of cow manure and human faeces, the retention times of the slurry were significantly longer, more than 25 days for each digester and more than 100 days after the total process in all digesters. This long retention time implied the complete process after two series step in Digester 1, Digester 3, and Digester 4, that was identified by the fact that the degradation process in Digester 5 and Digester 6 did not significantly decrease TS and VFA concentrations. The methane content obtained was lower than previously researches, this might cause due to air entrainment that happens in biogas compression process. It can be concluded that many serial digesters (more than 2) are not necessarily needed if the retention time of the slurry in each digester had been significantly longer.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信