{"title":"基于动态网络仿真的复杂项目脆弱性潜在机制表征","authors":"Jin Zhu, A. Mostafavi","doi":"10.1109/WSC.2017.8247973","DOIUrl":null,"url":null,"abstract":"The objective of this study was to investigate the underlying mechanisms of vulnerability in complex construction projects using simulation experiments. Specifically, two hypotheses related to project vulnerability were tested: (1) project schedule performance is negatively correlated with vulnerability; (2) the level of project vulnerability is positively correlated with project exposure to uncertainty and organizational complexity. In the proposed dynamic network simulation methodology, construction projects are modeled as heterogeneous meta-networks. Project vulnerability is assessed by the decrease in meta-network efficiency due to uncertainty-induced perturbations. Project schedule deviation is used as a measure for quantifying the impacts of vulnerability on project performance outcomes. The proposed simulation methodology was implemented in three case studies of real-world construction projects. Monte-Carlo simulation experiments were conducted under different simulation scenarios consisting of varying levels of uncertainty and project planning strategies to test the hypotheses.","PeriodicalId":145780,"journal":{"name":"2017 Winter Simulation Conference (WSC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-12-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Characterization of the underlying mechanisms of vulnerability in complex projects using dynamic network simulation\",\"authors\":\"Jin Zhu, A. Mostafavi\",\"doi\":\"10.1109/WSC.2017.8247973\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The objective of this study was to investigate the underlying mechanisms of vulnerability in complex construction projects using simulation experiments. Specifically, two hypotheses related to project vulnerability were tested: (1) project schedule performance is negatively correlated with vulnerability; (2) the level of project vulnerability is positively correlated with project exposure to uncertainty and organizational complexity. In the proposed dynamic network simulation methodology, construction projects are modeled as heterogeneous meta-networks. Project vulnerability is assessed by the decrease in meta-network efficiency due to uncertainty-induced perturbations. Project schedule deviation is used as a measure for quantifying the impacts of vulnerability on project performance outcomes. The proposed simulation methodology was implemented in three case studies of real-world construction projects. Monte-Carlo simulation experiments were conducted under different simulation scenarios consisting of varying levels of uncertainty and project planning strategies to test the hypotheses.\",\"PeriodicalId\":145780,\"journal\":{\"name\":\"2017 Winter Simulation Conference (WSC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-12-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 Winter Simulation Conference (WSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC.2017.8247973\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Winter Simulation Conference (WSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC.2017.8247973","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

本研究的目的是通过模拟实验来探讨复杂建设项目中脆弱性的潜在机制。具体而言,检验了两个与项目脆弱性相关的假设:(1)项目进度绩效与脆弱性呈负相关;(2)项目脆弱性水平与项目不确定性暴露和组织复杂性呈正相关。在提出的动态网络仿真方法中,建筑项目被建模为异构元网络。通过不确定性扰动导致的元网络效率下降来评估项目脆弱性。项目进度偏差被用作量化脆弱性对项目绩效结果影响的一种度量。提出的模拟方法在现实世界建筑项目的三个案例研究中得到了实施。通过蒙特卡罗模拟实验,在不同不确定性水平和项目规划策略的不同模拟情景下对假设进行验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Characterization of the underlying mechanisms of vulnerability in complex projects using dynamic network simulation
The objective of this study was to investigate the underlying mechanisms of vulnerability in complex construction projects using simulation experiments. Specifically, two hypotheses related to project vulnerability were tested: (1) project schedule performance is negatively correlated with vulnerability; (2) the level of project vulnerability is positively correlated with project exposure to uncertainty and organizational complexity. In the proposed dynamic network simulation methodology, construction projects are modeled as heterogeneous meta-networks. Project vulnerability is assessed by the decrease in meta-network efficiency due to uncertainty-induced perturbations. Project schedule deviation is used as a measure for quantifying the impacts of vulnerability on project performance outcomes. The proposed simulation methodology was implemented in three case studies of real-world construction projects. Monte-Carlo simulation experiments were conducted under different simulation scenarios consisting of varying levels of uncertainty and project planning strategies to test the hypotheses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信