{"title":"使用人员和项目相关因素的敏捷评估","authors":"R. Popli, N. Chauhan","doi":"10.1109/INDIACOM.2014.6828023","DOIUrl":null,"url":null,"abstract":"The key measures of any project about its perfectness are ability to complete in the scheduled time and within the estimated cost. Cost and effort are important factors whenever a project is developed. The estimation of cost and effort is a difficult task in Agile environment. It has been observed that the current Agile methods mostly depends on an expert opinion, planning poker and historical data of project for estimation of cost, size, effort and duration. In absence of the historical data and experts the previous methods are not efficient. So there is need of an algorithmic method, which can calculate cost and effort of the project. In this direction S.Bhalero, Maya Ingel [2] has considered some project-related factors that calculate the size as well as duration of the project. However, several other project as well as people related factors may affect the Agile environment. In this work an Algorithmic estimation method is being proposed considering various factors thereby estimating the more accurate release date, cost, effort and duration for the project. The effectiveness and feasibility of the proposed algorithm has been shown by considering three cases in which different levels of factors are taken and compared.","PeriodicalId":404873,"journal":{"name":"2014 International Conference on Computing for Sustainable Global Development (INDIACom)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-03-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"31","resultStr":"{\"title\":\"Agile estimation using people and project related factors\",\"authors\":\"R. Popli, N. Chauhan\",\"doi\":\"10.1109/INDIACOM.2014.6828023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The key measures of any project about its perfectness are ability to complete in the scheduled time and within the estimated cost. Cost and effort are important factors whenever a project is developed. The estimation of cost and effort is a difficult task in Agile environment. It has been observed that the current Agile methods mostly depends on an expert opinion, planning poker and historical data of project for estimation of cost, size, effort and duration. In absence of the historical data and experts the previous methods are not efficient. So there is need of an algorithmic method, which can calculate cost and effort of the project. In this direction S.Bhalero, Maya Ingel [2] has considered some project-related factors that calculate the size as well as duration of the project. However, several other project as well as people related factors may affect the Agile environment. In this work an Algorithmic estimation method is being proposed considering various factors thereby estimating the more accurate release date, cost, effort and duration for the project. The effectiveness and feasibility of the proposed algorithm has been shown by considering three cases in which different levels of factors are taken and compared.\",\"PeriodicalId\":404873,\"journal\":{\"name\":\"2014 International Conference on Computing for Sustainable Global Development (INDIACom)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-03-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"31\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 International Conference on Computing for Sustainable Global Development (INDIACom)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/INDIACOM.2014.6828023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Conference on Computing for Sustainable Global Development (INDIACom)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INDIACOM.2014.6828023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Agile estimation using people and project related factors
The key measures of any project about its perfectness are ability to complete in the scheduled time and within the estimated cost. Cost and effort are important factors whenever a project is developed. The estimation of cost and effort is a difficult task in Agile environment. It has been observed that the current Agile methods mostly depends on an expert opinion, planning poker and historical data of project for estimation of cost, size, effort and duration. In absence of the historical data and experts the previous methods are not efficient. So there is need of an algorithmic method, which can calculate cost and effort of the project. In this direction S.Bhalero, Maya Ingel [2] has considered some project-related factors that calculate the size as well as duration of the project. However, several other project as well as people related factors may affect the Agile environment. In this work an Algorithmic estimation method is being proposed considering various factors thereby estimating the more accurate release date, cost, effort and duration for the project. The effectiveness and feasibility of the proposed algorithm has been shown by considering three cases in which different levels of factors are taken and compared.