Chan-Young Park, H. Kim, J. Won, Woosik Jang, S. Han
{"title":"模块化施工方法选择研究——以模块化方法的优势与障碍为中心","authors":"Chan-Young Park, H. Kim, J. Won, Woosik Jang, S. Han","doi":"10.6106/KJCEM.2016.17.4.012","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":220018,"journal":{"name":"Korean Journal of Construction Engineering and Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A Study for Selecting Modular Construction Method - Focus on Benefits and Barriers of Modular Method -\",\"authors\":\"Chan-Young Park, H. Kim, J. Won, Woosik Jang, S. Han\",\"doi\":\"10.6106/KJCEM.2016.17.4.012\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\",\"PeriodicalId\":220018,\"journal\":{\"name\":\"Korean Journal of Construction Engineering and Management\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Korean Journal of Construction Engineering and Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.6106/KJCEM.2016.17.4.012\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Korean Journal of Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.6106/KJCEM.2016.17.4.012","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}