{"title":"正反面调度的多项式可解np困难特殊情况","authors":"Elisa Chinos, N. Vakhania","doi":"10.37394/232027.2022.4.2","DOIUrl":null,"url":null,"abstract":"We consider a basic single-machine scheduling problem when jobs have release and delivery times and the objective is to minimize maximum job lateness. This problem is known to be strongly NP-hard. We study inherent structure of this problem exploring its special cases and the conditions when the problem can be efficiently solved.","PeriodicalId":145183,"journal":{"name":"International Journal of Electrical Engineering and Computer Science","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Polynomially Solvable and NP-hard Special Cases for Scheduling with Heads and Tails\",\"authors\":\"Elisa Chinos, N. Vakhania\",\"doi\":\"10.37394/232027.2022.4.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We consider a basic single-machine scheduling problem when jobs have release and delivery times and the objective is to minimize maximum job lateness. This problem is known to be strongly NP-hard. We study inherent structure of this problem exploring its special cases and the conditions when the problem can be efficiently solved.\",\"PeriodicalId\":145183,\"journal\":{\"name\":\"International Journal of Electrical Engineering and Computer Science\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Electrical Engineering and Computer Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.37394/232027.2022.4.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Electrical Engineering and Computer Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37394/232027.2022.4.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Polynomially Solvable and NP-hard Special Cases for Scheduling with Heads and Tails
We consider a basic single-machine scheduling problem when jobs have release and delivery times and the objective is to minimize maximum job lateness. This problem is known to be strongly NP-hard. We study inherent structure of this problem exploring its special cases and the conditions when the problem can be efficiently solved.